Ph.D. in Engineering (I.I.T. Kharagpur @ 05.01.2015 - 10.10.2018)
M.Tech in Structural Engineering (N.I.T. Durgapur @ 2005 - 2007)
B.Tech in Civil Engineering (Jalpaiguri Govt Eng. College @ 2002 - 2005)
Diploma in Civil Engineering (A. P. C. Roy Polytechnic, Jadavpur @ 1999 - 2002)
Higher Secondary (Kashiram Das Institution, Katwa @ 1997)
Secondary (Kashiram Das Institution, Katwa @ 1995)
3). Assistant Professor Grade-I (Level 12) : 27.06.2022 to till date
2). Assistant Professor Grade-II (Level 11) : 12.10.2012 to 26.06.2022
1). Assistant Professor Grade-II (Level 10) : 12.10.2007 to 11.10.2012
1). Blast impact (FEM-SPH Coupling) on bridges/structures/mines
2). Wind impact (CFD) on bridges/structures
3). Retrofitting, Quality Control, and Construction management for bridges/structures
R & D / Consultancy Projects | Investigator | Co-investigator | Sponsered Agency | Duration | Status |
---|---|---|---|---|---|
Effect of Explosive Reactive Armour on Bridges under blast loading
|
Dr. Somnath Karmakar | NIL | NIT Durgapur |
2 years |
Completed |
Odd Semester (2024-2025) @ 12 hrs.
P.G.
i). Advanced Reinforced Concrete (CE 1002), Full @ 4 hrs
U.G.
i). Building Construction and Concrete Technology (CEC 303), Half @ 2 hrs
ii). Structural Analysis-II Sessional (CES 551), Full @ 3 hrs
iii). Civil Engineering drawing Sessional (CES352), Full @ 3 hrs
Even Semester (2024-2025) @ 8 hrs.
P.G.
i). Advanced Bridge Engineering (CE 9033), Full @ 3 Hrs
U.G.
i). Design of Concrete Structures (CEC402), Half @ 2 hrs
ii). Design of Concrete Structure Sessional (CES452), Full @ 3 hrs
Sl.No. | Title | Name of the PI | Name of the CoPIs | Funding Agency | Amount (Rs.) | Project Type | Project Status | Date of Initiation | Date of Completion |
---|---|---|---|---|---|---|---|---|---|
1 | 154). Proof checking of 2 nos bridges under S. E. R. between Narayangarh and Bhadrak Section without site visits | Dr. Somnath Karmakar | NIL | Private | Consultancy | Ongoing | 2024-12-05 | ||
2 | 156). Proof checking of 11 nos bridges under ECR between Madhubani to Sagauli Section without site visits | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Ongoing | 2024-11-26 | ||
3 | 155). Safety checking RCC bridge, approach road, Guide bund and protection works without site visits | Dr. Somnath Karmakar | NIL | Private | Consultancy | Ongoing | 2024-11-20 | ||
4 | 153). Proof checking of the mix designs of M15, 20, 25, 30 & 35 | Dr. Somnath Karmakar | NIL | Private | Consultancy | Ongoing | 2024-09-19 | ||
5 | 151). Proof checking of the structural design and drawings for the construction of 91.0 m span steel truss bridge under GTA_WBSRDA Kalimpong, with site visits | Dr. Somnath Karmakar | NIL | Private | Consultancy | Ongoing | 2024-08-29 | 2024-12-18 | |
6 | 150). Proof checking of the construction of 4 lane ROB and its approach road at Ekangarsarai at NH33 | Dr. Somnath Karmakar | NIL | Private | Consultancy | Ongoing | 2024-08-29 | 2024-10-29 | |
7 | 148). Proof checking of design and drawings for Form-work of ORP at AF STN CHABUA under MES | Dr. Somnath Karmakar | NIL | MES | Consultancy | Ongoing | 2024-07-22 | 2024-08-28 | |
8 | 147). Proof checking of the structural design and drawings of a Road and Bridge near Upper Cart Road under GTA_WBSRDA Kalimpong | Dr. Somnath Karmakar | NIL | GOI | Consultancy | Ongoing | 2024-07-22 | 2024-11-07 | |
9 | 149). Proof checking of design and drawings of 20 nos. bridges in Samastipur Division under EC Indian Railway | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Ongoing | 2024-06-27 | ||
10 | 145). Proof checking of design and drawings of the Stripping Shed for Loco shop Wagon at Jamalpur Railway workshop | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Ongoing | 2024-06-27 | 2024-07-03 | |
11 | 152). Safety checking of 9 nos Over Head Reservoir at various places of Murshidabad district under P. H. Engineering Department, Govt of WB | Dr. Somnath Karmakar | NIL | GoWB | Consultancy | Ongoing | 2024-06-22 | ||
12 | 146). Proof checking of design and drawings of G+6 residential building and earth retaining structure of Oil India houshing at, Gwuahati | Dr. Somnath Karmakar | NIL | MES | Consultancy | Completed | 2024-06-12 | 2024-08-30 | |
13 | 144). Proof checking of design and drawings of 500 dia MS water pipe line support and girder over subway spans 10 m and 18 m at Kharagpur | Dr. Somnath Karmakar | NIL | Private | Consultancy | Ongoing | 2024-05-02 | 2024-05-09 | |
14 | 143). Proof checking of design and drawings of various structures of ROB in lieu of level crossing no 47c in under Malda division | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Ongoing | 2024-05-02 | 2024-05-24 | |
15 | 142). Slope stability analysis of the earthen slope from land sliding at Gangtak under MES | Dr. Somnath Karmakar | Plus Two | MES | Consultancy | Ongoing | 2024-02-19 | 2024-04-04 | |
16 | 141). Proof checking of structural design and drawing 3 nos bridges, one no foothpath and trolly refuge and one embankment under IR | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Ongoing | 2024-02-19 | 2024-03-02 | |
17 | 140). Proof checking of structural design and drawing of substructures and foundations for 5 nos bridges under IR | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Ongoing | 2024-02-13 | 2024-03-21 | |
18 | 139). Safety checking of the ROB of bow-string girder of 64.60 m span under NH81 | Dr. Somnath Karmakar | NIL | GDCL | Consultancy | Ongoing | 2023-12-20 | 2024-01-09 | |
19 | Proof checking of the G+7 building proven of deficient married ACCN at Bangalore, | Dr. Somnath Karmakar | NIL | Air Force | Consultancy | Ongoing | 2023-09-19 | 2023-09-29 | |
20 | Proof checking of the sructural design and drawing of Industrial building at Indore | Dr. Somnath Karmakar | Two | Private | Consultancy | Ongoing | 2023-09-15 | 2023-10-12 | |
21 | Proof checking of a commertial building (G + 0) at Tezpur | Dr. Somnath Karmakar | NIL | Private | Consultancy | Ongoing | 2023-08-07 | 2023-08-12 | |
22 | Raft foundation and retaining wall for Igloo structure, Kathihar @ MES | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2023-07-10 | 2023-07-12 | |
23 | Proof checking of structural design and drawing of different ROB of Dhanbad under ECR | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2023-06-20 | 2023-06-27 | |
24 | Erection and launching scheme of 60 m span for proposed ROB no. 382 at 137/24-27 KM, and 30.5 m span for proposed ROR no. 30B | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2023-06-12 | 2023-06-16 | |
25 | Design and drawing of the protective wall basket under Indian Army | Dr. Somnath Karmakar | NIL | MES | Consultancy | Completed | 2023-06-05 | 2023-06-07 | |
26 | Site visit and report development for an all-weather usable condition certificate cum Building Safety Certificate for a Private School at Durgapur | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2023-05-23 | 2023-05-25 | |
27 | Physical site visit to check the old RC overhead water tank at Satitara and Gokarna under WB PHE Department | Dr. Somnath Karmakar | NIL | GoWB | Consultancy | Completed | 2023-04-17 | 2023-05-15 | |
28 | Proof checking of the G+3 buildings and site visit for safety audit of the same of a college, Durgapur | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2023-04-17 | 2023-07-31 | |
29 | Design and safety of special 'OHE' supporting portal structure of 48m span suitable for holding load of 15 nos. OHE | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2023-04-13 | 2023-05-04 | |
30 | Proof checking of the structural design & drawing of buildings under the NEC of India | Dr. Somnath Karmakar | NIL | NEC @ GoI | Consultancy | Completed | 2023-03-16 | 2023-06-16 | |
31 | Proof checking of erection & launching scheme of 30.5 m RDSO standard steel superstructure under KGP Division | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2023-03-15 | 2023-03-19 | |
32 | Proof checking of Structural drawing and design for its stability of a relocatable Fast Erecting Modular Shelter | Dr. Somnath Karmakar | NIL | GoI | Consultancy | Completed | 2023-03-10 | 2023-05-18 | |
33 | Physical site visit to an RC overhead water tank at Berhampur | Dr. Somnath Karmakar | NIL | GoWB | Consultancy | Completed | 2023-01-31 | 2023-06-23 | |
34 | Safety checking of one flyover and one major bridge on NH-730 under GoUP PWD | Dr. Somnath Karmakar | NIL | GoUP | Consultancy | Completed | 2023-01-18 | 2023-06-11 | |
35 | Proof checking of the erection & launching scheme of 30 and 24 m for ROB over SH 5, WB | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2022-12-28 | 2023-01-11 | |
36 | Consultancy on the mix design of M30 grade of concrete for special use | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2022-11-29 | 2023-01-25 | |
37 | Proof checking of a 30 m span steel bridge superstructure in Sikkam, GoS | Dr. Somnath Karmakar | NIL | GoSK | Consultancy | Completed | 2022-11-18 | 2022-12-01 | |
38 | Safety audit of an old brick masonry Govt building at Asansol | Dr. Somnath Karmakar | NIL | GoWB | Consultancy | Completed | 2022-11-05 | 2022-11-15 | |
39 | Substructure of a ROB over LC Gate No. CA26 under NFR | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2022-09-26 | 2023-05-04 | |
40 | Road safety audit of NH-31 from 00.00 KM to 27.50 KM | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2022-08-01 | 2023-01-12 | |
41 | Proof checking of the design and drawing of the 4 - lane ROB and its Approaches at KM 41.760 of NH-2B in the State of west Bengal and Proof checking of erection scheme of railway girders | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2022-04-26 | 2024-02-04 | |
42 | Proof checking of construction of 04xLRC IGLOO storage ACCN for the Military station | Dr. Somnath Karmakar | NIL | MES | Consultancy | Completed | 2022-04-25 | 2022-04-29 | |
43 | Proof checking of bridge design and drawing for Intake well over river Ajay | Dr. Somnath Karmakar | NIL | Shyam Sel and Power Limited | Consultancy | Completed | 2022-04-04 | 2022-05-27 | |
44 | Proof checking of the G + 2 type officers quarter in LGSF technology of IOCL | Dr. Somnath Karmakar | NIL | IOCL | Consultancy | Completed | 2022-04-04 | 2022-04-09 | |
45 | Proof checking of 20 m span steel bridge superstructure along Chuba Khola at Sikkam | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2022-03-29 | 2022-04-06 | |
46 | Proof checking of the pile Integrity test at Rajarhat-Newtown campus under Housing board, WB | Dr. Somnath Karmakar | NIL | GoWB | Consultancy | Completed | 2022-03-23 | 2022-02-17 | |
47 | Mix design of M30 grade of concrete | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2022-01-24 | 2022-02-12 | |
48 | Proof checking of the Erection & launching scheme of 36 m bow string girder between Kharagpur to Hijli for 3Rd line | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2021-11-02 | 2021-11-29 | |
49 | Safety checking of Kendriya Vidyalaya Asansol | Dr. Somnath Karmakar | NIL | Kendriya Vidyalaya | Consultancy | Completed | 2021-08-05 | 2021-08-27 | |
50 | Proof checking of the design of a new shed near test shed at CLW, E.R. | Dr. Somnath Karmakar | NIL | CLW | Consultancy | Completed | 2021-06-25 | 2021-07-17 | |
51 | Proof checking of ROB of NH-82 under BSRDCL | Dr. Somnath Karmakar | NIL | BSRDCL and NHIA | Consultancy | Completed | 2021-06-18 | 2021-10-01 | |
52 | Proof checking of G+1 building at central University Jharkhand | Dr. Somnath Karmakar | NIL | GoI | Consultancy | Completed | 2021-04-23 | 2021-06-11 | |
53 | Proof checking of 2 nos bridges over NH-31C | Dr. Somnath Karmakar | NIL | NHIA | Consultancy | Completed | 2021-04-23 | 2021-07-05 | |
54 | Proof checking of a steel structural shed of 2400 sqm | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2021-04-07 | 2021-04-21 | |
55 | Erection & launching scheme of 32.5 m composite girder of ROB on KGP-Tata Section | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2021-03-10 | 2021-03-12 | |
56 | Proof checking of the design and drawing of NH 44A from Ch. 0.000 to 16.290 km | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2021-01-27 | 2021-07-15 | |
57 | Proof checking of the design and drawing of 45 nos bridges’ substructures and foundation under SE Railway | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2021-01-01 | 2022-04-07 | |
58 | Proof checking of the design and drawing of the Bow-String substructure and foundation of ROB of NH-82 | Dr. Somnath Karmakar | NIL | BSRDCL and NHIA | Consultancy | Completed | 2020-12-17 | 2021-10-01 | |
59 | Proof checking of the design and drawing of the superstructure at NH-33 | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2020-11-13 | 2020-12-10 | |
60 | Proof checking of the design and drawing for retrofitting and redevelopment of smart city network | Dr. Somnath Karmakar | NIL | GoI @ Smart City Authority | Consultancy | Completed | 2020-10-15 | 2021-06-28 | |
61 | Proof checking of the design and drawing of 2 nos superstructure & Pier Cap of Major Bridge at NH-33 | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2020-08-17 | 2021-02-20 | |
62 | Proof checking of the design and drawing of 2 lanes roads for widening and improvement of NH-75 | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2020-07-22 | 2020-08-17 | |
63 | Proof checking of the design and drawing of the structural shed of Hindustan Aeronautics Limited (HAL) | Dr. Somnath Karmakar | NIL | HAL | Consultancy | Completed | 2020-07-01 | 2020-07-30 | |
64 | Mix design of M25 & M35 grade of concrete | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2020-02-28 | 2020-06-05 | |
65 | Consultancy on cracks checking for G + 4 storied residential building by NDT checks | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2020-02-28 | 2020-07-01 | |
66 | Proof checking of the G+3 multi-storied building near Airport | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2020-01-20 | 2020-07-14 | |
67 | Proof checking of 75 nos bridges under NFR | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2020-01-17 | 2021-04-10 | |
68 | Proof checking of the R.C. drain near railway station under ER | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2019-11-26 | 2019-12-02 | |
69 | Safety checking of the drawing and design of NH-31 | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2019-09-16 | 2021-12-11 | |
70 | Proof checking of the structural design & drawing of RC drain cum pathway for a Smart City | Dr. Somnath Karmakar | NIL | GoI @ Smart City Authority | Consultancy | Completed | 2019-07-23 | 2019-07-26 | |
71 | Structural stability check by physical inspection at Chloride building | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2019-06-03 | 2019-11-04 | |
72 | Proof checking of the structural design & drawing of plate girders & semi through bridges of ER | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2019-04-10 | 2019-11-07 | |
73 | Effect of Explosive Reactive Armour on Bridges under blast loading | Dr. Somnath Karmakar | NIL | NIT Durgapur | 500,000 | Sponsored | Completed | 2019-04-04 | 2021-04-03 |
74 | Site visit and its report for the structural stability at MES base camp | Dr. Somnath Karmakar | NIL | MES | Consultancy | Completed | 2019-03-01 | 2019-06-26 | |
75 | Site visit and report for structural failure at Shakambhari Ispat & Power Ltd | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2019-03-01 | 2019-06-25 | |
76 | Proof checking of the design & drawing of different railway bridges under Indian Rail | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2019-02-01 | 2020-08-12 | |
77 | Proof checking of the structural design & drawing of hanger building under AAI | Dr. Somnath Karmakar | NIL | AAI | Consultancy | Completed | 2019-01-01 | 2019-04-10 | |
78 | Safety checking of NH-44 from Ch. 318.650 to 339.940 KM | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2018-11-26 | 2021-03-31 | |
79 | Proof checking of the structural design & drawing of 6 nos bridges at NH-37 | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2018-11-20 | 2019-07-12 | |
80 | Geotechnical report of BHEL power plant in the state of Tamil Nadu | Dr. Somnath Karmakar | NIL | BHEL | Consultancy | Completed | 2018-10-09 | 2019-07-05 | |
81 | Proof checking of the structural design & drawing of RC building of MES | Dr. Somnath Karmakar | NIL | MES | Consultancy | Completed | 2018-09-07 | 2019-06-27 | |
82 | Proof checking of the substructure of an industrial building of MES | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2018-08-27 | 2019-08-26 | |
83 | Proof checking of the design & drawing of a 50 m steel bridge at Sikkim | Dr. Somnath Karmakar | NIL | GoI | Consultancy | Completed | 2018-08-21 | 2018-08-29 | |
84 | Structural stability analysis of a shed for SPV project of Century ply | Dr. Somnath Karmakar | NIL | Century Ply | Consultancy | Completed | 2018-06-11 | 2018-06-22 | |
85 | Proof checking of the design & drawing of a small bridge | Dr. Somnath Karmakar | NIL | IOCL | Consultancy | Completed | 2018-06-11 | 2018-07-05 | |
86 | Proof checking of the design and drawing of three nos foot over bridges under KMDA | Dr. Somnath Karmakar | Plus one | KMDA | Consultancy | Completed | 2018-04-18 | 2018-06-04 | |
87 | Proof checking of the design and drawing of a boundary wall at WBSIDC LTD, Durgapur | Dr. Somnath Karmakar | Plus one | GoWB | Consultancy | Completed | 2018-04-16 | 2018-04-24 | |
88 | Proof checking of the design and drawing of thrust bed and box under of ER | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2018-04-12 | 2018-05-03 | |
89 | Proof checking of the design & drawing of NH-512 | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2018-02-02 | 2019-10-23 | |
90 | Proof checking of the design and drawing of a ROB under NH-82 | Dr. Somnath Karmakar | Plus one | BSRDCL and NHIA | Consultancy | Completed | 2017-12-29 | 2021-12-31 | |
91 | Proof checking of the design and drawing of NH-23 | Dr. Somnath Karmakar | Plus one | NHAI | Consultancy | Completed | 2017-12-04 | 2018-02-23 | |
92 | Site Visit & report of MBF & auxiliary unit at JBIL, Durgapur | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2017-11-30 | 2017-12-31 | |
93 | Proof checking of the design and drawing of 4 nos bridge substructures under NBDD | Dr. Somnath Karmakar | Plus one | NBDA | Consultancy | Completed | 2017-11-29 | 2017-12-20 | |
94 | Proof checking of the design and drawing of a Module Mounting Structure at Ferozepur and Kapurthala | Dr. Somnath Karmakar | Plus one | Vikramsolar Pvt. Ltd. and NTPC | Consultancy | Completed | 2017-11-25 | 2018-12-31 | |
95 | Proof checking of the design and drawing a minor bridges under NH-82 | Dr. Somnath Karmakar | Plus one | BSRDCL and NHIA | Consultancy | Completed | 2017-11-23 | 2018-03-12 | |
96 | Proof checking of the design and drawing of NH-125 | Dr. Somnath Karmakar | Plus one | NHAI | Consultancy | Completed | 2017-11-23 | 2021-12-31 | |
97 | Proof checking of the design and drawing for NH-78 | Dr. Somnath Karmakar | Plus one | NHAI | Consultancy | Completed | 2017-11-23 | 2021-12-31 | |
98 | Proof checking of the design and drawing of a bridge under W Medinipur Z.P. | Dr. Somnath Karmakar | Plus one | GoWB | Consultancy | Completed | 2017-06-15 | 2017-07-17 | |
99 | Proof checking of the design and drawing of steel truss for Car Service station at Andal | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2017-05-22 | 2017-06-25 | |
100 | Proof checking of the design and drawing of thrust bed and box under ECR | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2017-05-01 | 2019-04-30 | |
101 | Proof checking of the design and drawing of A/C side gable covering for Parking bay | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2017-04-21 | 2018-03-08 | |
102 | Seepage and strength analysis by NDT of RUBs under ER. | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2017-04-21 | 2018-07-18 | |
103 | Proof checking of the design and drawing a ROB oh NH-82 under BSRDCL and ECR | Dr. Somnath Karmakar | Plus one | BSRDCL and NHIA | Consultancy | Completed | 2017-02-15 | 2018-12-24 | |
104 | Proof checking of the design and drawing of the Major Bridge under NFR | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2017-01-31 | 2020-08-12 | |
105 | Proof checking of the drawing and design of a Bridge under W. Medinipur Z.P. | Dr. Somnath Karmakar | Plus one | GoWB | Consultancy | Completed | 2017-01-11 | 2017-07-17 | |
106 | Proof checking of the structural design and drawing of Krishna Bridge (64+5x120+64) m span | Dr. Somnath Karmakar | Plus one | GoT | Consultancy | Completed | 2017-01-04 | 2019-07-05 | |
107 | Proof checking of the design and drawing for light maintenance Hanger | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2016-11-16 | 2016-11-29 | |
108 | Proof checking of the design and drawing of Road ch. from 46.550 to 59.697 KM of NH-81 | Dr. Somnath Karmakar | Plus one | NHAI | Consultancy | Completed | 2016-11-15 | 2017-02-07 | |
109 | Site Visit to check the structural stability at Shyam sel & Power Ltd at Jamuria | Dr. Somnath Karmakar | Plus one | Shyam Sel and Power Limited | Consultancy | Completed | 2016-11-02 | 2016-11-12 | |
110 | Proof checking of the design and drawing of different ROB projects under ER | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2016-09-29 | 2019-02-25 | |
111 | Proof checking of the design and drawing of pile cap for a bridge over river Guddu at Chandrapura-Gomia Road | Dr. Somnath Karmakar | Plus one | State Highway Authority of Jharkhand | Consultancy | Completed | 2016-09-09 | 2016-10-09 | |
112 | Site Visit for structural stability at a private School, Durgapur | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2016-05-30 | 2016-06-03 | |
113 | Proof checking of the design and drawing of a PEB structure for NTPC | Dr. Somnath Karmakar | Plus one | Vikramsolar Pvt. Ltd. and NTPC | Consultancy | Completed | 2016-05-30 | 2016-08-02 | |
114 | Design of double storied PEB structure including foundation. | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2016-05-24 | 2016-06-15 | |
115 | Proof checking of the design and drawing 3 nos proposed ROB under ECR | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2016-05-02 | 2019-07-05 | |
116 | Proof checking of the design and drawing for widening & strengthening of NH-133 with 2 lanes with paved shoulder | Dr. Somnath Karmakar | Plus one | NHAI | Consultancy | Completed | 2016-05-02 | 2016-05-06 | |
117 | Proof checking of the bridge design and drawing over Koel River in Danda-Lalgarh road | Dr. Somnath Karmakar | Plus one | State Highway Authority of Jharkhand | Consultancy | Completed | 2016-04-05 | 2016-05-06 | |
118 | Proof checking of the design and drawing for the widening and strengthening of KTK road (from 0.00 KM to 82.055 Km) to 2 lanes with paved shoulder | Dr. Somnath Karmakar | Plus one | State Highway Authority of Jharkhand | Consultancy | Completed | 2016-03-17 | 2016-11-04 | |
119 | Proof checking of the design and drawing 12 nos. Minor Bridges, 11nos. Major Bridges & 12 nos. ROB under ECR | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2016-02-02 | 2019-07-05 | |
120 | Third Party Quality Control/Assurance for the construction of super-speciality block under PMSSY at B.S. Medical College, executed by CPWD | Dr. Somnath Karmakar | Plus one | CPWD | Consultancy | Completed | 2016-01-07 | 2019-08-20 | |
121 | Proof checking of the design and drawing of the Sub & Superstructure of AFS hanger | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2016-01-05 | 2016-01-16 | |
122 | Proof checking of the design and drawing for the construction of superspeciality block under PMSSY at B.S. Medical College | Dr. Somnath Karmakar | Plus one | GoI | Consultancy | Completed | 2016-01-05 | 2016-09-29 | |
123 | Proof checking of the design and drawing for the Substructure of guest house at Numaligarh Refinery Limited, IOCL | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2016-01-05 | 2016-01-29 | |
124 | Proof checking of the design and drawing for the strengthening and widening/reconstruction of 55 KM DMN Road to two lanes with paved shoulder | Dr. Somnath Karmakar | Plus one | State Highway Authority of Jharkhand | Consultancy | Completed | 2016-01-05 | 2016-02-08 | |
125 | Proof checking of design and drawing for Major & Minor Bridges structures at Manpur bye pass under ECR | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2015-12-14 | 2019-07-05 | |
126 | Site visit for Structural stability assessment of existing 40 flats at KIT scheme No. 118, of IOCL, Kolkata | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2015-08-25 | 2015-09-15 | |
127 | Site visit for Structural stability assessment of existing old canteen building of IOCL, HMRBPL-Mourigram HQ, Howrah. | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2015-08-20 | 2015-10-14 | |
128 | Proof checking for a Pre-Engineered building at Aizawl and Mizoram project | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2015-08-20 | 2015-09-02 | |
129 | Site visit for for the existing Civil Structure of IOCL, Pipelines Division, Durgapur | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2015-08-13 | 2015-08-21 | |
130 | Site Visit for an Auditorium at a private School, Durgapur | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2015-08-10 | 2015-09-02 | |
131 | Site Visit for an Auditorium at a private School, Durgapur | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2015-04-29 | 2015-04-30 | |
132 | Proof checking of the design and drawing for strengthening and Widening/Reconstruction of SH13 (JH), Length-69 Km, to two lanes with paved shoulder under EPC Mode | Dr. Somnath Karmakar | Plus one | NHIA | Consultancy | Completed | 2015-02-25 | 2016-04-05 | |
133 | Proof checking of the structural design and drawing of the 1000 Room (2000 seats) Boys Hostel Stilt +G+13 storied building at IIT Campus | Dr. Somnath Karmakar | Plus one | CPWD | Consultancy | Completed | 2015-02-24 | 2015-04-07 | |
134 | 27). Third Party Quality Control/Assurance in various projects, executed by CPWD at IIT campus | Dr. Somnath Karmakar | Plus one | CPWD | Consultancy | Completed | 2015-02-24 | 2023-06-19 | |
135 | Proof checking of the B+G+9 storied research buildings, Auditorium and underground sump of IIT | Dr. Somnath Karmakar | Plus one | CPWD/GoI | Consultancy | Completed | 2015-02-20 | 2015-07-18 | |
136 | Consultancy on the raw material of Power Gird | Dr. Somnath Karmakar | Plus one | Power Gird | Consultancy | Completed | 2015-02-18 | 2015-03-31 | |
137 | Site visit at IOCL for stability checking of a part of structure | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2015-02-18 | 2015-02-20 | |
138 | Design and inspection of compound boundary wall for BPCL TOP | Dr. Somnath Karmakar | Plus one | BPCL | Consultancy | Completed | 2015-02-13 | 2015-05-28 | |
139 | Proof checking for the ROB design and drawing of BG line under Eastern Railways | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2015-02-12 | 2019-07-05 | |
140 | Proof checking of the design and drawing for Ammunition shelters | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2015-02-03 | 2015-02-20 | |
141 | Mix design of M30 grade of concrete | Dr. Somnath Karmakar | Plus one | CPWD | Consultancy | Completed | 2014-12-18 | 2015-02-17 | |
142 | Pavement Investigation of NH-44 from Udaipur to Sabroom | Dr. Somnath Karmakar | Plus one | NHAI | Consultancy | Completed | 2014-12-09 | 2015-03-23 | |
143 | Design of a structural part for the Auditorium of a private school in Durgapur | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2014-12-09 | 2014-12-22 | |
144 | Site Visit for Auditorium at a private School in Durgapur | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2014-11-12 | 2014-11-26 | |
145 | Mix design M25 and M30 grades of concrete | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2014-11-03 | 2015-01-08 | |
146 | Proof checking of G+6 storied apartment building at Durgapur | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2014-09-23 | 2014-09-30 | |
147 | Proof checking of 31 nos. minor bridge under EC Railways, Mahendrughat | Dr. Somnath Karmakar | Plus One | Rail | Consultancy | Completed | 2014-09-09 | 2019-07-05 | |
148 | Proof checking of the structural drawings & designs of ITI Buildings under GoWB | Dr. Somnath Karmakar | Plus one | GoWB | Consultancy | Completed | 2014-08-26 | 2014-09-09 | |
149 | Site Visit for detailed investigation of the reason of downfall of East side compound wall of BPCL | Dr. Somnath Karmakar | Plus one | BPCL | Consultancy | Completed | 2014-08-26 | 2014-08-29 | |
150 | Proof checking of the substructure & Superstructure of AFS hanger at North-East | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2014-06-27 | 2014-07-18 | |
151 | Proof checking of the pile structure system of AFS hanger | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2014-05-22 | 2014-05-29 | |
152 | Proof checking of the substructure & Superstructure AFS hanger | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2014-02-24 | 2022-03-04 | |
153 | Proof checking of the substructure & Superstructure of AFS hanger | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2014-02-24 | 2014-03-24 | |
154 | Proof checking of the structural design and drawing of flood light towers at LPG bottling plant Durgapur | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2014-01-21 | 2014-03-28 | |
155 | Proof checking of the foundation design for LPG pump at Durgapur | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2014-01-21 | 2014-03-28 | |
156 | Proof checking of the Air Port craft shed-1 | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2013-12-19 | 2014-02-24 | |
157 | 1). Structural design to raise the height of boundary wall at LPG bottling plant at Durgapur | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2013-03-06 | 2013-07-10 |
Sl.No. | Title | Name of the PI | Name of the CoPIs | Funding Agency | Amount (Rs.) | Project Type | Project Status | Date of Initiation | Date of Completion |
---|---|---|---|---|---|---|---|---|---|
1 | Effect of Explosive Reactive Armour on Bridges under blast loading | Dr. Somnath Karmakar | NIL | NIT Durgapur | 500,000 | Sponsored | Completed | 2019-04-04 | 2021-04-03 |
Sl.No. | Title | Name of the PI | Name of the CoPIs | Funding Agency | Amount (Rs.) | Project Type | Project Status | Date of Initiation | Date of Completion |
---|---|---|---|---|---|---|---|---|---|
1 | 154). Proof checking of 2 nos bridges under S. E. R. between Narayangarh and Bhadrak Section without site visits | Dr. Somnath Karmakar | NIL | Private | Consultancy | Ongoing | 2024-12-05 | ||
2 | 156). Proof checking of 11 nos bridges under ECR between Madhubani to Sagauli Section without site visits | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Ongoing | 2024-11-26 | ||
3 | 155). Safety checking RCC bridge, approach road, Guide bund and protection works without site visits | Dr. Somnath Karmakar | NIL | Private | Consultancy | Ongoing | 2024-11-20 | ||
4 | 153). Proof checking of the mix designs of M15, 20, 25, 30 & 35 | Dr. Somnath Karmakar | NIL | Private | Consultancy | Ongoing | 2024-09-19 | ||
5 | 151). Proof checking of the structural design and drawings for the construction of 91.0 m span steel truss bridge under GTA_WBSRDA Kalimpong, with site visits | Dr. Somnath Karmakar | NIL | Private | Consultancy | Ongoing | 2024-08-29 | 2024-12-18 | |
6 | 150). Proof checking of the construction of 4 lane ROB and its approach road at Ekangarsarai at NH33 | Dr. Somnath Karmakar | NIL | Private | Consultancy | Ongoing | 2024-08-29 | 2024-10-29 | |
7 | 147). Proof checking of the structural design and drawings of a Road and Bridge near Upper Cart Road under GTA_WBSRDA Kalimpong | Dr. Somnath Karmakar | NIL | GOI | Consultancy | Ongoing | 2024-07-22 | 2024-11-07 | |
8 | 148). Proof checking of design and drawings for Form-work of ORP at AF STN CHABUA under MES | Dr. Somnath Karmakar | NIL | MES | Consultancy | Ongoing | 2024-07-22 | 2024-08-28 | |
9 | 145). Proof checking of design and drawings of the Stripping Shed for Loco shop Wagon at Jamalpur Railway workshop | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Ongoing | 2024-06-27 | 2024-07-03 | |
10 | 149). Proof checking of design and drawings of 20 nos. bridges in Samastipur Division under EC Indian Railway | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Ongoing | 2024-06-27 | ||
11 | 152). Safety checking of 9 nos Over Head Reservoir at various places of Murshidabad district under P. H. Engineering Department, Govt of WB | Dr. Somnath Karmakar | NIL | GoWB | Consultancy | Ongoing | 2024-06-22 | ||
12 | 146). Proof checking of design and drawings of G+6 residential building and earth retaining structure of Oil India houshing at, Gwuahati | Dr. Somnath Karmakar | NIL | MES | Consultancy | Completed | 2024-06-12 | 2024-08-30 | |
13 | 144). Proof checking of design and drawings of 500 dia MS water pipe line support and girder over subway spans 10 m and 18 m at Kharagpur | Dr. Somnath Karmakar | NIL | Private | Consultancy | Ongoing | 2024-05-02 | 2024-05-09 | |
14 | 143). Proof checking of design and drawings of various structures of ROB in lieu of level crossing no 47c in under Malda division | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Ongoing | 2024-05-02 | 2024-05-24 | |
15 | 141). Proof checking of structural design and drawing 3 nos bridges, one no foothpath and trolly refuge and one embankment under IR | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Ongoing | 2024-02-19 | 2024-03-02 | |
16 | 142). Slope stability analysis of the earthen slope from land sliding at Gangtak under MES | Dr. Somnath Karmakar | Plus Two | MES | Consultancy | Ongoing | 2024-02-19 | 2024-04-04 | |
17 | 140). Proof checking of structural design and drawing of substructures and foundations for 5 nos bridges under IR | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Ongoing | 2024-02-13 | 2024-03-21 | |
18 | 139). Safety checking of the ROB of bow-string girder of 64.60 m span under NH81 | Dr. Somnath Karmakar | NIL | GDCL | Consultancy | Ongoing | 2023-12-20 | 2024-01-09 | |
19 | Proof checking of the G+7 building proven of deficient married ACCN at Bangalore, | Dr. Somnath Karmakar | NIL | Air Force | Consultancy | Ongoing | 2023-09-19 | 2023-09-29 | |
20 | Proof checking of the sructural design and drawing of Industrial building at Indore | Dr. Somnath Karmakar | Two | Private | Consultancy | Ongoing | 2023-09-15 | 2023-10-12 | |
21 | Proof checking of a commertial building (G + 0) at Tezpur | Dr. Somnath Karmakar | NIL | Private | Consultancy | Ongoing | 2023-08-07 | 2023-08-12 | |
22 | Raft foundation and retaining wall for Igloo structure, Kathihar @ MES | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2023-07-10 | 2023-07-12 | |
23 | Proof checking of structural design and drawing of different ROB of Dhanbad under ECR | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2023-06-20 | 2023-06-27 | |
24 | Erection and launching scheme of 60 m span for proposed ROB no. 382 at 137/24-27 KM, and 30.5 m span for proposed ROR no. 30B | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2023-06-12 | 2023-06-16 | |
25 | Design and drawing of the protective wall basket under Indian Army | Dr. Somnath Karmakar | NIL | MES | Consultancy | Completed | 2023-06-05 | 2023-06-07 | |
26 | Site visit and report development for an all-weather usable condition certificate cum Building Safety Certificate for a Private School at Durgapur | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2023-05-23 | 2023-05-25 | |
27 | Proof checking of the G+3 buildings and site visit for safety audit of the same of a college, Durgapur | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2023-04-17 | 2023-07-31 | |
28 | Physical site visit to check the old RC overhead water tank at Satitara and Gokarna under WB PHE Department | Dr. Somnath Karmakar | NIL | GoWB | Consultancy | Completed | 2023-04-17 | 2023-05-15 | |
29 | Design and safety of special 'OHE' supporting portal structure of 48m span suitable for holding load of 15 nos. OHE | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2023-04-13 | 2023-05-04 | |
30 | Proof checking of the structural design & drawing of buildings under the NEC of India | Dr. Somnath Karmakar | NIL | NEC @ GoI | Consultancy | Completed | 2023-03-16 | 2023-06-16 | |
31 | Proof checking of erection & launching scheme of 30.5 m RDSO standard steel superstructure under KGP Division | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2023-03-15 | 2023-03-19 | |
32 | Proof checking of Structural drawing and design for its stability of a relocatable Fast Erecting Modular Shelter | Dr. Somnath Karmakar | NIL | GoI | Consultancy | Completed | 2023-03-10 | 2023-05-18 | |
33 | Physical site visit to an RC overhead water tank at Berhampur | Dr. Somnath Karmakar | NIL | GoWB | Consultancy | Completed | 2023-01-31 | 2023-06-23 | |
34 | Safety checking of one flyover and one major bridge on NH-730 under GoUP PWD | Dr. Somnath Karmakar | NIL | GoUP | Consultancy | Completed | 2023-01-18 | 2023-06-11 | |
35 | Proof checking of the erection & launching scheme of 30 and 24 m for ROB over SH 5, WB | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2022-12-28 | 2023-01-11 | |
36 | Consultancy on the mix design of M30 grade of concrete for special use | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2022-11-29 | 2023-01-25 | |
37 | Proof checking of a 30 m span steel bridge superstructure in Sikkam, GoS | Dr. Somnath Karmakar | NIL | GoSK | Consultancy | Completed | 2022-11-18 | 2022-12-01 | |
38 | Safety audit of an old brick masonry Govt building at Asansol | Dr. Somnath Karmakar | NIL | GoWB | Consultancy | Completed | 2022-11-05 | 2022-11-15 | |
39 | Substructure of a ROB over LC Gate No. CA26 under NFR | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2022-09-26 | 2023-05-04 | |
40 | Road safety audit of NH-31 from 00.00 KM to 27.50 KM | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2022-08-01 | 2023-01-12 | |
41 | Proof checking of the design and drawing of the 4 - lane ROB and its Approaches at KM 41.760 of NH-2B in the State of west Bengal and Proof checking of erection scheme of railway girders | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2022-04-26 | 2024-02-04 | |
42 | Proof checking of construction of 04xLRC IGLOO storage ACCN for the Military station | Dr. Somnath Karmakar | NIL | MES | Consultancy | Completed | 2022-04-25 | 2022-04-29 | |
43 | Proof checking of bridge design and drawing for Intake well over river Ajay | Dr. Somnath Karmakar | NIL | Shyam Sel and Power Limited | Consultancy | Completed | 2022-04-04 | 2022-05-27 | |
44 | Proof checking of the G + 2 type officers quarter in LGSF technology of IOCL | Dr. Somnath Karmakar | NIL | IOCL | Consultancy | Completed | 2022-04-04 | 2022-04-09 | |
45 | Proof checking of 20 m span steel bridge superstructure along Chuba Khola at Sikkam | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2022-03-29 | 2022-04-06 | |
46 | Proof checking of the pile Integrity test at Rajarhat-Newtown campus under Housing board, WB | Dr. Somnath Karmakar | NIL | GoWB | Consultancy | Completed | 2022-03-23 | 2022-02-17 | |
47 | Mix design of M30 grade of concrete | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2022-01-24 | 2022-02-12 | |
48 | Proof checking of the Erection & launching scheme of 36 m bow string girder between Kharagpur to Hijli for 3Rd line | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2021-11-02 | 2021-11-29 | |
49 | Safety checking of Kendriya Vidyalaya Asansol | Dr. Somnath Karmakar | NIL | Kendriya Vidyalaya | Consultancy | Completed | 2021-08-05 | 2021-08-27 | |
50 | Proof checking of the design of a new shed near test shed at CLW, E.R. | Dr. Somnath Karmakar | NIL | CLW | Consultancy | Completed | 2021-06-25 | 2021-07-17 | |
51 | Proof checking of ROB of NH-82 under BSRDCL | Dr. Somnath Karmakar | NIL | BSRDCL and NHIA | Consultancy | Completed | 2021-06-18 | 2021-10-01 | |
52 | Proof checking of G+1 building at central University Jharkhand | Dr. Somnath Karmakar | NIL | GoI | Consultancy | Completed | 2021-04-23 | 2021-06-11 | |
53 | Proof checking of 2 nos bridges over NH-31C | Dr. Somnath Karmakar | NIL | NHIA | Consultancy | Completed | 2021-04-23 | 2021-07-05 | |
54 | Proof checking of a steel structural shed of 2400 sqm | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2021-04-07 | 2021-04-21 | |
55 | Erection & launching scheme of 32.5 m composite girder of ROB on KGP-Tata Section | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2021-03-10 | 2021-03-12 | |
56 | Proof checking of the design and drawing of NH 44A from Ch. 0.000 to 16.290 km | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2021-01-27 | 2021-07-15 | |
57 | Proof checking of the design and drawing of 45 nos bridges’ substructures and foundation under SE Railway | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2021-01-01 | 2022-04-07 | |
58 | Proof checking of the design and drawing of the Bow-String substructure and foundation of ROB of NH-82 | Dr. Somnath Karmakar | NIL | BSRDCL and NHIA | Consultancy | Completed | 2020-12-17 | 2021-10-01 | |
59 | Proof checking of the design and drawing of the superstructure at NH-33 | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2020-11-13 | 2020-12-10 | |
60 | Proof checking of the design and drawing for retrofitting and redevelopment of smart city network | Dr. Somnath Karmakar | NIL | GoI @ Smart City Authority | Consultancy | Completed | 2020-10-15 | 2021-06-28 | |
61 | Proof checking of the design and drawing of 2 nos superstructure & Pier Cap of Major Bridge at NH-33 | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2020-08-17 | 2021-02-20 | |
62 | Proof checking of the design and drawing of 2 lanes roads for widening and improvement of NH-75 | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2020-07-22 | 2020-08-17 | |
63 | Proof checking of the design and drawing of the structural shed of Hindustan Aeronautics Limited (HAL) | Dr. Somnath Karmakar | NIL | HAL | Consultancy | Completed | 2020-07-01 | 2020-07-30 | |
64 | Mix design of M25 & M35 grade of concrete | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2020-02-28 | 2020-06-05 | |
65 | Consultancy on cracks checking for G + 4 storied residential building by NDT checks | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2020-02-28 | 2020-07-01 | |
66 | Proof checking of the G+3 multi-storied building near Airport | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2020-01-20 | 2020-07-14 | |
67 | Proof checking of 75 nos bridges under NFR | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2020-01-17 | 2021-04-10 | |
68 | Proof checking of the R.C. drain near railway station under ER | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2019-11-26 | 2019-12-02 | |
69 | Safety checking of the drawing and design of NH-31 | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2019-09-16 | 2021-12-11 | |
70 | Proof checking of the structural design & drawing of RC drain cum pathway for a Smart City | Dr. Somnath Karmakar | NIL | GoI @ Smart City Authority | Consultancy | Completed | 2019-07-23 | 2019-07-26 | |
71 | Structural stability check by physical inspection at Chloride building | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2019-06-03 | 2019-11-04 | |
72 | Proof checking of the structural design & drawing of plate girders & semi through bridges of ER | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2019-04-10 | 2019-11-07 | |
73 | Site visit and report for structural failure at Shakambhari Ispat & Power Ltd | Dr. Somnath Karmakar | NIL | Private | Consultancy | Completed | 2019-03-01 | 2019-06-25 | |
74 | Site visit and its report for the structural stability at MES base camp | Dr. Somnath Karmakar | NIL | MES | Consultancy | Completed | 2019-03-01 | 2019-06-26 | |
75 | Proof checking of the design & drawing of different railway bridges under Indian Rail | Dr. Somnath Karmakar | NIL | Rail | Consultancy | Completed | 2019-02-01 | 2020-08-12 | |
76 | Proof checking of the structural design & drawing of hanger building under AAI | Dr. Somnath Karmakar | NIL | AAI | Consultancy | Completed | 2019-01-01 | 2019-04-10 | |
77 | Safety checking of NH-44 from Ch. 318.650 to 339.940 KM | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2018-11-26 | 2021-03-31 | |
78 | Proof checking of the structural design & drawing of 6 nos bridges at NH-37 | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2018-11-20 | 2019-07-12 | |
79 | Geotechnical report of BHEL power plant in the state of Tamil Nadu | Dr. Somnath Karmakar | NIL | BHEL | Consultancy | Completed | 2018-10-09 | 2019-07-05 | |
80 | Proof checking of the structural design & drawing of RC building of MES | Dr. Somnath Karmakar | NIL | MES | Consultancy | Completed | 2018-09-07 | 2019-06-27 | |
81 | Proof checking of the substructure of an industrial building of MES | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2018-08-27 | 2019-08-26 | |
82 | Proof checking of the design & drawing of a 50 m steel bridge at Sikkim | Dr. Somnath Karmakar | NIL | GoI | Consultancy | Completed | 2018-08-21 | 2018-08-29 | |
83 | Structural stability analysis of a shed for SPV project of Century ply | Dr. Somnath Karmakar | NIL | Century Ply | Consultancy | Completed | 2018-06-11 | 2018-06-22 | |
84 | Proof checking of the design & drawing of a small bridge | Dr. Somnath Karmakar | NIL | IOCL | Consultancy | Completed | 2018-06-11 | 2018-07-05 | |
85 | Proof checking of the design and drawing of three nos foot over bridges under KMDA | Dr. Somnath Karmakar | Plus one | KMDA | Consultancy | Completed | 2018-04-18 | 2018-06-04 | |
86 | Proof checking of the design and drawing of a boundary wall at WBSIDC LTD, Durgapur | Dr. Somnath Karmakar | Plus one | GoWB | Consultancy | Completed | 2018-04-16 | 2018-04-24 | |
87 | Proof checking of the design and drawing of thrust bed and box under of ER | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2018-04-12 | 2018-05-03 | |
88 | Proof checking of the design & drawing of NH-512 | Dr. Somnath Karmakar | NIL | NHAI | Consultancy | Completed | 2018-02-02 | 2019-10-23 | |
89 | Proof checking of the design and drawing of a ROB under NH-82 | Dr. Somnath Karmakar | Plus one | BSRDCL and NHIA | Consultancy | Completed | 2017-12-29 | 2021-12-31 | |
90 | Proof checking of the design and drawing of NH-23 | Dr. Somnath Karmakar | Plus one | NHAI | Consultancy | Completed | 2017-12-04 | 2018-02-23 | |
91 | Site Visit & report of MBF & auxiliary unit at JBIL, Durgapur | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2017-11-30 | 2017-12-31 | |
92 | Proof checking of the design and drawing of 4 nos bridge substructures under NBDD | Dr. Somnath Karmakar | Plus one | NBDA | Consultancy | Completed | 2017-11-29 | 2017-12-20 | |
93 | Proof checking of the design and drawing of a Module Mounting Structure at Ferozepur and Kapurthala | Dr. Somnath Karmakar | Plus one | Vikramsolar Pvt. Ltd. and NTPC | Consultancy | Completed | 2017-11-25 | 2018-12-31 | |
94 | Proof checking of the design and drawing for NH-78 | Dr. Somnath Karmakar | Plus one | NHAI | Consultancy | Completed | 2017-11-23 | 2021-12-31 | |
95 | Proof checking of the design and drawing of NH-125 | Dr. Somnath Karmakar | Plus one | NHAI | Consultancy | Completed | 2017-11-23 | 2021-12-31 | |
96 | Proof checking of the design and drawing a minor bridges under NH-82 | Dr. Somnath Karmakar | Plus one | BSRDCL and NHIA | Consultancy | Completed | 2017-11-23 | 2018-03-12 | |
97 | Proof checking of the design and drawing of a bridge under W Medinipur Z.P. | Dr. Somnath Karmakar | Plus one | GoWB | Consultancy | Completed | 2017-06-15 | 2017-07-17 | |
98 | Proof checking of the design and drawing of steel truss for Car Service station at Andal | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2017-05-22 | 2017-06-25 | |
99 | Proof checking of the design and drawing of thrust bed and box under ECR | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2017-05-01 | 2019-04-30 | |
100 | Seepage and strength analysis by NDT of RUBs under ER. | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2017-04-21 | 2018-07-18 | |
101 | Proof checking of the design and drawing of A/C side gable covering for Parking bay | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2017-04-21 | 2018-03-08 | |
102 | Proof checking of the design and drawing a ROB oh NH-82 under BSRDCL and ECR | Dr. Somnath Karmakar | Plus one | BSRDCL and NHIA | Consultancy | Completed | 2017-02-15 | 2018-12-24 | |
103 | Proof checking of the design and drawing of the Major Bridge under NFR | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2017-01-31 | 2020-08-12 | |
104 | Proof checking of the drawing and design of a Bridge under W. Medinipur Z.P. | Dr. Somnath Karmakar | Plus one | GoWB | Consultancy | Completed | 2017-01-11 | 2017-07-17 | |
105 | Proof checking of the structural design and drawing of Krishna Bridge (64+5x120+64) m span | Dr. Somnath Karmakar | Plus one | GoT | Consultancy | Completed | 2017-01-04 | 2019-07-05 | |
106 | Proof checking of the design and drawing for light maintenance Hanger | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2016-11-16 | 2016-11-29 | |
107 | Proof checking of the design and drawing of Road ch. from 46.550 to 59.697 KM of NH-81 | Dr. Somnath Karmakar | Plus one | NHAI | Consultancy | Completed | 2016-11-15 | 2017-02-07 | |
108 | Site Visit to check the structural stability at Shyam sel & Power Ltd at Jamuria | Dr. Somnath Karmakar | Plus one | Shyam Sel and Power Limited | Consultancy | Completed | 2016-11-02 | 2016-11-12 | |
109 | Proof checking of the design and drawing of different ROB projects under ER | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2016-09-29 | 2019-02-25 | |
110 | Proof checking of the design and drawing of pile cap for a bridge over river Guddu at Chandrapura-Gomia Road | Dr. Somnath Karmakar | Plus one | State Highway Authority of Jharkhand | Consultancy | Completed | 2016-09-09 | 2016-10-09 | |
111 | Proof checking of the design and drawing of a PEB structure for NTPC | Dr. Somnath Karmakar | Plus one | Vikramsolar Pvt. Ltd. and NTPC | Consultancy | Completed | 2016-05-30 | 2016-08-02 | |
112 | Site Visit for structural stability at a private School, Durgapur | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2016-05-30 | 2016-06-03 | |
113 | Design of double storied PEB structure including foundation. | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2016-05-24 | 2016-06-15 | |
114 | Proof checking of the design and drawing 3 nos proposed ROB under ECR | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2016-05-02 | 2019-07-05 | |
115 | Proof checking of the design and drawing for widening & strengthening of NH-133 with 2 lanes with paved shoulder | Dr. Somnath Karmakar | Plus one | NHAI | Consultancy | Completed | 2016-05-02 | 2016-05-06 | |
116 | Proof checking of the bridge design and drawing over Koel River in Danda-Lalgarh road | Dr. Somnath Karmakar | Plus one | State Highway Authority of Jharkhand | Consultancy | Completed | 2016-04-05 | 2016-05-06 | |
117 | Proof checking of the design and drawing for the widening and strengthening of KTK road (from 0.00 KM to 82.055 Km) to 2 lanes with paved shoulder | Dr. Somnath Karmakar | Plus one | State Highway Authority of Jharkhand | Consultancy | Completed | 2016-03-17 | 2016-11-04 | |
118 | Proof checking of the design and drawing 12 nos. Minor Bridges, 11nos. Major Bridges & 12 nos. ROB under ECR | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2016-02-02 | 2019-07-05 | |
119 | Third Party Quality Control/Assurance for the construction of super-speciality block under PMSSY at B.S. Medical College, executed by CPWD | Dr. Somnath Karmakar | Plus one | CPWD | Consultancy | Completed | 2016-01-07 | 2019-08-20 | |
120 | Proof checking of the design and drawing of the Sub & Superstructure of AFS hanger | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2016-01-05 | 2016-01-16 | |
121 | Proof checking of the design and drawing for the Substructure of guest house at Numaligarh Refinery Limited, IOCL | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2016-01-05 | 2016-01-29 | |
122 | Proof checking of the design and drawing for the strengthening and widening/reconstruction of 55 KM DMN Road to two lanes with paved shoulder | Dr. Somnath Karmakar | Plus one | State Highway Authority of Jharkhand | Consultancy | Completed | 2016-01-05 | 2016-02-08 | |
123 | Proof checking of the design and drawing for the construction of superspeciality block under PMSSY at B.S. Medical College | Dr. Somnath Karmakar | Plus one | GoI | Consultancy | Completed | 2016-01-05 | 2016-09-29 | |
124 | Proof checking of design and drawing for Major & Minor Bridges structures at Manpur bye pass under ECR | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2015-12-14 | 2019-07-05 | |
125 | Site visit for Structural stability assessment of existing 40 flats at KIT scheme No. 118, of IOCL, Kolkata | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2015-08-25 | 2015-09-15 | |
126 | Site visit for Structural stability assessment of existing old canteen building of IOCL, HMRBPL-Mourigram HQ, Howrah. | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2015-08-20 | 2015-10-14 | |
127 | Proof checking for a Pre-Engineered building at Aizawl and Mizoram project | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2015-08-20 | 2015-09-02 | |
128 | Site visit for for the existing Civil Structure of IOCL, Pipelines Division, Durgapur | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2015-08-13 | 2015-08-21 | |
129 | Site Visit for an Auditorium at a private School, Durgapur | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2015-08-10 | 2015-09-02 | |
130 | Site Visit for an Auditorium at a private School, Durgapur | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2015-04-29 | 2015-04-30 | |
131 | Proof checking of the design and drawing for strengthening and Widening/Reconstruction of SH13 (JH), Length-69 Km, to two lanes with paved shoulder under EPC Mode | Dr. Somnath Karmakar | Plus one | NHIA | Consultancy | Completed | 2015-02-25 | 2016-04-05 | |
132 | 27). Third Party Quality Control/Assurance in various projects, executed by CPWD at IIT campus | Dr. Somnath Karmakar | Plus one | CPWD | Consultancy | Completed | 2015-02-24 | 2023-06-19 | |
133 | Proof checking of the structural design and drawing of the 1000 Room (2000 seats) Boys Hostel Stilt +G+13 storied building at IIT Campus | Dr. Somnath Karmakar | Plus one | CPWD | Consultancy | Completed | 2015-02-24 | 2015-04-07 | |
134 | Proof checking of the B+G+9 storied research buildings, Auditorium and underground sump of IIT | Dr. Somnath Karmakar | Plus one | CPWD/GoI | Consultancy | Completed | 2015-02-20 | 2015-07-18 | |
135 | Consultancy on the raw material of Power Gird | Dr. Somnath Karmakar | Plus one | Power Gird | Consultancy | Completed | 2015-02-18 | 2015-03-31 | |
136 | Site visit at IOCL for stability checking of a part of structure | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2015-02-18 | 2015-02-20 | |
137 | Design and inspection of compound boundary wall for BPCL TOP | Dr. Somnath Karmakar | Plus one | BPCL | Consultancy | Completed | 2015-02-13 | 2015-05-28 | |
138 | Proof checking for the ROB design and drawing of BG line under Eastern Railways | Dr. Somnath Karmakar | Plus one | Rail | Consultancy | Completed | 2015-02-12 | 2019-07-05 | |
139 | Proof checking of the design and drawing for Ammunition shelters | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2015-02-03 | 2015-02-20 | |
140 | Mix design of M30 grade of concrete | Dr. Somnath Karmakar | Plus one | CPWD | Consultancy | Completed | 2014-12-18 | 2015-02-17 | |
141 | Pavement Investigation of NH-44 from Udaipur to Sabroom | Dr. Somnath Karmakar | Plus one | NHAI | Consultancy | Completed | 2014-12-09 | 2015-03-23 | |
142 | Design of a structural part for the Auditorium of a private school in Durgapur | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2014-12-09 | 2014-12-22 | |
143 | Site Visit for Auditorium at a private School in Durgapur | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2014-11-12 | 2014-11-26 | |
144 | Mix design M25 and M30 grades of concrete | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2014-11-03 | 2015-01-08 | |
145 | Proof checking of G+6 storied apartment building at Durgapur | Dr. Somnath Karmakar | Plus one | Private | Consultancy | Completed | 2014-09-23 | 2014-09-30 | |
146 | Proof checking of 31 nos. minor bridge under EC Railways, Mahendrughat | Dr. Somnath Karmakar | Plus One | Rail | Consultancy | Completed | 2014-09-09 | 2019-07-05 | |
147 | Proof checking of the structural drawings & designs of ITI Buildings under GoWB | Dr. Somnath Karmakar | Plus one | GoWB | Consultancy | Completed | 2014-08-26 | 2014-09-09 | |
148 | Site Visit for detailed investigation of the reason of downfall of East side compound wall of BPCL | Dr. Somnath Karmakar | Plus one | BPCL | Consultancy | Completed | 2014-08-26 | 2014-08-29 | |
149 | Proof checking of the substructure & Superstructure of AFS hanger at North-East | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2014-06-27 | 2014-07-18 | |
150 | Proof checking of the pile structure system of AFS hanger | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2014-05-22 | 2014-05-29 | |
151 | Proof checking of the substructure & Superstructure AFS hanger | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2014-02-24 | 2022-03-04 | |
152 | Proof checking of the substructure & Superstructure of AFS hanger | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2014-02-24 | 2014-03-24 | |
153 | Proof checking of the structural design and drawing of flood light towers at LPG bottling plant Durgapur | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2014-01-21 | 2014-03-28 | |
154 | Proof checking of the foundation design for LPG pump at Durgapur | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2014-01-21 | 2014-03-28 | |
155 | Proof checking of the Air Port craft shed-1 | Dr. Somnath Karmakar | Plus one | MES | Consultancy | Completed | 2013-12-19 | 2014-02-24 | |
156 | 1). Structural design to raise the height of boundary wall at LPG bottling plant at Durgapur | Dr. Somnath Karmakar | Plus one | IOCL | Consultancy | Completed | 2013-03-06 | 2013-07-10 |
ID | Details | Year |
---|---|---|
2025 | 1. Efficiency of the Dynamic Relaxation Method in the stabilisation process of Bridge and Building Frame Somnath Karmakar, Goutam Kutti and Amit Shaw Advances in Engineering Software (Q1) 200 (2025) 103828 SCIE https://doi.org/10.1016/j.advengsoft.2024.103828 Elsevier Ltd | 2025 |
2025 | 2. Digitalised Document Management System for Construction Claims and Disputes to Enhance the Smoothness of Advanced Construction Projects using the Building Information Modeling Integrated Framework Bittu Ghosh and Somnath Karmakar Journal of Legal Affairs and Dispute Resolution in Engineering and Construction (Q2) 17 (1) (2025): 04524038 SCOPUS https://doi.10.1061/JLADAH/LADR-1203 ASCE | 2025 |
2024 | 3. The state-of-the-art review of spectral analysis of Wind Spectrum Models Taniya Saha and Somnath Karmakar Wind and Structures, An International Journal (Q3) 39 (5) (2024): 329-349 SCIE https://doi.org/10.12989/was.2024.39.5.329 Techno Press | 2024 |
2024 | 4. Improvements of the damage responses and failure modes of an RC Vehicle Over Pass bridge under contact explosion using FEM-SPH coupled computational frameworks Goutam Kuti, Shuvra Saha and Somnath Karmakar International Journal of Protective Structures (Q2) 20414196241304036 SCOPUS https://doi.10.1177/20414196241304036 SAGE | 2024 |
2024 | 5. Effect of cross beam in Vortex-Induced vibration and flutter analysis at large attack angle for the twin-deck bridges Puja Haldar and Somnath Karmakar Wind and Structures, An International Journal (Q3) 39 (x): xxx - xxx SCIE https://doi.accepted on 08.09.2024 Techno Press | 2024 |
2024 | 6. Third-Party Quality Control Concept, Methodology, and Implementation in the Building and Housing Construction Industry in India Somnath Karmakar International Journal of Construction Management (Q1) Online available SCOPUS https://doi.org/10.1080/15623599.2024.2397227 Taylor & Francis | 2024 |
2024 | 7. Aerodynamic and Flutter Performance of the Bridge Deck with various countermeasures using Computational Fluid Dynamics Puja Haldar and Somnath Karmakar Structure and Infrastructure Engineering (Q1) Online available SCIE https://doi.10.1080/15732479.2024.2408444 Taylor & Francis | 2024 |
2024 | 8. Aerodynamic and Aeroelastic Response of Wind Barrier over Trapezoidal Box Girder Bridge under Turbulence Wind Puja Haldar and Somnath Karmakar Indian Journal of Engineering and Materials Sciences (Q2) 31 (2): 245-257 SCI https://doi.10.56042/ijems.v31i2.1034 CSIR-National Institute of Science Communication And Policy Research (India) | 2024 |
2024 | 9. Failure mode and response of a typical RC straight and skew highway girder bridge under the blast, wrapped with and without a non-Explosive Reactive Armour using FEM-SPH coupling Shuvra Saha and Somnath Karmakar Engineering Failure Analysis (Q1) 161 (2024) 108330 SCIE https://doi.org/10.1016/j.engfailanal.2024.108330 Elsevier Ltd | 2024 |
2024 | 10. Experimental and Numerical Performance analysis of Alccofine-based crumb rubber concrete under Quasi-Static cyclic Load Puja Haldar and Somnath Karmakar Canadian Journal of Civil Engineering (Q3) 51 (8) 2024: 841-857 SCI http://dx.doi.org/10.1139/cjce-2023-0122 Canadian Science Publishing | 2024 |
2024 | 11. Assessing the Causes of Claims in Highway construction projects with a case study: A Construction Practitioner's Perspective Bittu Ghosh and Somnath Karmakar Asian Journal of Civil Engineering (Q3) 25(3) 2024: 3035-3048 SCOPUS https://doi.org/10.1007/s42107-023-00961-2 Springer | 2024 |
2023 | 12. The conventional construction scenario and the Emergence of Advance Technologies in Bridge construction: Implementation, Impediments, and Case Study Bittu Ghosh and Somnath Karmakar Journal of The Institution of Engineers (India): Series A (Q3) 104 (3) 2023: 709-720 SCOPUS https://doi.org/10.1007/s40030-023-00732-x Springer | 2023 |
2023 | 13. Wind Response on RC Trapezoidal Box Girder Bridge using Computational Fluid Dynamics Puja Haldar and Somnath Karmakar Sadhana - Academy Proceedings in engineering Sciences (Q2) 48 (2) 2023: 74 SCIE https://doi.org/10.1007/s12046-023-02127-x Indian Academy of Sciences @ Springer | 2023 |
2022 | 14. State of the art review of aerodynamic effects on bridges Puja Haldar and Somnath Karmakar Journal of The Institution of Engineers (India): Series A (Q3) 103 (3) 2022: 943 - 960 SCOPUS https://doi.org/10.1007/s40030-022-00640-6 Springer | 2022 |
2021 | 15. An Experimental Study on Fatigue Property of alccofine based Crumb Rubber Concrete Puja Haldar and Somnath Karmakar International Journal of Engineering Sustainability (Q1) 174 (5) 2021: 235-250 SCIE https://doi.org/10.1680/jensu.20.00080 ICE Publishing Ltd | 2021 |
2021 | 16. Response of R.C. plates under blast loading using FEM-SPH coupled method Somnath Karmakar and Amit Shaw Engineering Failure Analysis (Q1) 125 (2021): 105409 SCIE https://doi.org/10.1016/j.engfailanal.2021.105409 Elsevier Ltd | 2021 |
2016 | 17. Behaviour of reinforced concrete building frame subjected to different types of blast loading Dasari Sudheer Kumar, Pallavi Rai, Rajneesh Kumar, Somnath Karmakar and Showmen Saha Indian Journal of Science and Technology (Q0) 9 (23) 2016: 1 - 6 SCOPUS https://doi.org/10.17485/ijst/2016/v9i23/95966 Indian Society for Education and Environment and Informatics (India) Ltd. | 2016 |
2015 | 18. Ground Granulated Blast Furnace Slag (GGBS) based Concrete Exposed to Artificial Marine Environment (AME) and Sustainable Retrofitting using Glass Fiber Reinforced Polymer (GFRP) sheets Souvik Das, Gaurav Singh, Abdulaziz Abdullahi Ahmed, Showmen Saha, and Somnath Karmakar Procedia - Social and Behavioral Science (Q0) 195 (2015): 2272 – 2279 Others https://doi.org/10.1016/j.sbspro.2015.06.316 Elsevier Ltd | 2015 |
2015 | 19. Study of granulated blast furnace slag as fine aggregates in concrete for sustainable infrastructure Souvik Das, Gaurav Singh, Abdulaziz Abdullahi Ahmed, Showmen Saha, and Somnath Karmakar Procedia - Social and Behavioral Sciences (Q0) 195 (2015): 2804 – 2812 Others https://doi.org/10.1016/j.sbspro.2015.06.316 Elsevier Ltd | 2015 |
2013 | 20. Effect of skew angle on longitudinal girder (support shear, moment, torsion) and deck slab of an IRC skew bridge Arindam Dhar, Mithil Mazumder, Mandakini Chowdhury and Somnath Karmakar The Indian Concrete Journal (Q4) 87 (12) 2013: 46-52 SCOPUS EID: 2-s2.0-84889019978 ACC Limited, Mumbai | 2013 |
2012 | 21. Response of a T-beam reinforced concrete two lane bridge under blast loading Somnath Karmakar International Journal of Earth Science and Engineering (Q4) 05 {06(01)} 2012: 1708-1714 SCOPUS EID: 2-s2.0-84905740316 Cafet Innova Technical Society, India | 2012 |
ID | Details | Year |
---|---|---|
2024 | 1.Taniya Saha, and Somnath Karmakar, (19th - 22th August 2024), Wind response of various-shaped RC Chimney, International Conference on Advances in Wind and Structures-2024 (ACEM24-AWS24), Seoul National University, Korea, pp Seoul National University, Korea, | 2024 |
2024 | 2.Soumyajit Ghosh and Somnath Karmakar, (25th - 27th September 2024), Damage analysis on recent bridge collapses in India, International Conference on Concrete under Severe Conditions – Environment and Loading 2024 (CONSEC-2024), IIT Mardas, Chennai, India, pp: 935 - 938 IIT Mardas, Chennai, India, | 2024 |
2023 | 3. Shuvra Saha, and Somnath Karmakar, (11th - 12th August 2023), Strengthening of the Structural Element by Using Armour – A Review of a Blast Protective Material, International Conference on Creative and Innovative Solutions in Civil Engineering (CISCE-2023), [IOP Conf. Series: Earth and Environmental Science 1326 (2024) 012060, IOP Publishing doi:10.1088/1755-1315/1326/1/012060], MNIT Jaipur, India. MNIT Jaipur, India | 2023 |
2023 | 4. Taniya Saha, and Somnath Karmakar, (11th - 12th August 2023), A Methodical Review of Progression of The Solari's Wind Response Spectrum, International Conference on Creative and Innovative Solutions in Civil Engineering (CISCE-2023), MNIT Jaipur, India, pp MNIT Jaipur, India | 2023 |
2023 | 5. Bittu Ghosh, and Somnath Karmakar, (11th - 12th August 2023), 3D Printing Technology as a Future of Construction: A Review, International Conference on Creative and Innovative Solutions in Civil Engineering (CISCE-2023), [IOP Conf. Series: Earth and Environmental Science 1326 (2024) 012001, IOP Publishing doi:10.1088/1755-1315/1326/1/012001] MNIT Jaipur, India MNIT Jaipur, India | 2023 |
2023 | 6. Samir Kumar, Puja Haldar, Prithwish Kundu, and Somnath Karmakar, (27th -28th April 2023), Effect of large wind attack angle on Stone-cutter Bridge, 2nd International Conference on Energy Resources and Technology for Sustainable Developments, IIEST Shibpur, India[[International Journal of Emerging Technology and Advanced Engineering, 14 (2024): 44-50, https://doi.org/10.46338/ijetae142324_07] IIEST Shibpur, India | 2023 |
2023 | 7. Bittu Ghosh and Somnath Karmakar, (14th - 17th March 2023) A review of implementing Building Information Modeling in the Construction Industry, UKIERI Concrete Congress on sustainable concrete infrastructure, pp 932 to 941 NIT Jalandhar, India | 2023 |
2022 | 8. Shuvra Saha, Monojit Mondal, and Somnath Karmakar, (19th - 22nd December 2022), A Systematic Approach for Analysis of Structure under Blast Load – An Overview 12th Structural Engineering Convention - An International Event, pp 1265 - 1272. MNIT Jaipur, India | 2022 |
2022 | 9. Puja Haldar, Somnath Karmakar, and Souvik Roy (19th - 22nd December 2022), Critical Analysis of the Chenab Bridge, India, 12th Structural Engineering Convention - An International Event, pp 549 -554. MNIT Jaipur, India, | 2022 |
2020 | 10. Puja Haldar, Adithya Chilipili and Somnath Karmakar, (2nd – 4th March 2020), Aerodynamic effect on Bridges: A Study, Second ASCE India Conference on Challenges of Resilient and Sustainable Infrastructure Development in Emerging Economies, pp 2044-2051 ASCE Indian Section, Kolkata, India | 2020 |
2016 | 11. Palavi Rai, Rajneesh Kumar, Somnath Karmakar, and Dasari Sudheer Kumar (19th - 20th March 2016), Analysis of T-Beam Bridge Subjected to Blast Loading using FEM-SPH Coupling, International conference on Innovation Research in Civil, computer Science, Information Technology, mechanical, Electrical and Electronics Engineering, [International Journal of Civil Engineering and Applications, Vol.3, No. 07Spl, June 2016], pp 93-97 JNU-New Delhi, India | 2016 |
2016 | 12. Dasari Sudheer Kumar, Rajneesh Kumar, Palavi Rai, Somnath Karmakar, Amit Shaw and Showmen Saha, (25th - 27th February 2016), SPH and Non SPH Damage of Bridge Under Blast using FEM-SPH Coupling, International conference on Advances in Dynamics, Vibration and control, [Book chapter by Narosa Publishing House PVT. Ltd, Daryaganj, New Delhi @ ISBN 978-81-8487-550-8], pp 488-493 NIT Durgapur, India | 2016 |
2016 | 13. Rajneesh Kumar, Dasari Sudheer Kumar, Palavi Rai, Somnath Karmakar, Amit Shaw and Showmen Saha, (25th - 27th February 2016), Comparative study of Reflecting and non-reflecting boundary Condition for Blast loading, International conference on Advances in Dynamics, Vibration and control, [Book chapter by Narosa Publishing House PVT. Ltd, Daryaganj, New Delhi @ ISBN 978-81-8487-550-8], pp 469-473 NIT Durgapur, India | 2016 |
2016 | 14. Utpalendu Khamaru, Showmen Sahab, Somnath Karmakar, (25th - 27th February 2016), Review of application of shape memory alloys in civil structure, International conference on Advances in Dynamics, Vibration and control, [Book chapter by Narosa Publishing House PVT. Ltd, Daryaganj, New Delhi @ ISBN 978-81-8487-550-8], pp 445-450 NIT Durgapur, India | 2016 |
2015 | 15. Needhi Kotoky, Tapati Tapanita Barik, Somnath Karmakar and Showmen Saha, (22th - 23th August 2015), A study on surface cracked volume of IRC T-beam bridge deck under blast loading, National seminar on Advanced Construction Materials, pp 25-32 Gandhi Institute for Education and Technology, Bhubaneswar, Odisha | 2015 |
2014 | 16. Bejay Kumar Yadav, Showmen Saha and Somnath Karmakar, (28th -30th December 2014), Dynamic Response of Curved Bridges due to Moving Loads - A Review, International conference on Decision Support Systems for Early warning and Mitigation of Disaster, pp 235-243 NIT Durgapur, India | 2014 |
2014 | 17. Anupam Kumar Biswas, Showmen Saha and Somnath Karmakar, (28th -30th December 2014), Strengthening of reinforced concrete beam-column joint with fiber reinforced polymers- An approach, International conference on Decision Support Systems for Early warning and Mitigation of Disaster, pp 226-234 NIT Durgapur, India | 2014 |
2014 | 18. Debayan Ghosh, Showmen Saha and Somnath Karmakar, (26th - 28th May 2014), Effects of accelerated ageing on the adhesive bond between concrete specimens and external GFRP reinforcements, International conference on Ageing of Materials and Structures, pp 486-492 Delft Technical University, Delft, The Netherlands | 2014 |
2014 | 19. Asim Mukherjee, Subashini Rajaram, Miaaza Hussain, Somnath Karmakar, Amit Shaw and Showmen Saha, (28th - 30th April 2014), Fundamentals properties of air blast using Coupled Method Part-2, International Conference on Innovations and Advances in Civil Engineering Towards Green and Sustainable Systems, pp 007-018 CIT-Coimbatore, Tamilnadu, India | 2014 |
2014 | 20. Dhananjoy Mandal, Debayan Ghosh, Showmen Saha and Somnath Karmakar, (2nd - 4th April 2014), Strengthening of structures using glass fibre reinforced plastic, International conference on Industrial Engineering Science and Application, pp 302-306 NIT Durgapur, West Bengal, India | 2014 |
2014 | 21. Surajit Biswas, Debayan Ghosh, Showmen Saha and Somnath Karmakar, (2nd - 4th April 2014), Steel fiber reinforced concrete in the service of Civil Engineering, International conference on Industrial Engineering Science and Application, pp 284-289 NIT Durgapur, West Bengal, India | 2014 |
2014 | 22. Dhananjoy Mandal, Debayan Ghosh, Surajit Biswas, Showmen Saha and Somnath Karmakar, (28th – 29th March 2014), Light efficient building in the service of Civil Engineering, International Conference on Advances in Engineering, Technology And Management, pp 18-21 NPR College of Engineering and Technology, Natham, Tamilnadu, India | 2014 |
2014 | 23. Asim Mukherjee, Subashini Rajaram, Miaaza Hussain, Somnath Karmakar, Amit Shaw and Showmen Saha, (7th - 8th March 2014), Fundamentals properties of air blast using Coupled Method Part-1, International Conference on Innovative Advancements in Engineering & Technology, JNU- Jaipur, India, (An international Journal of Jaipur National University (Inroads), Vol. 03, No 01Spl, January-June 2014), pp 72-79. JNU- Jaipur, India | 2014 |
2013 | 24. Asim Mukherjee, Somnath Karmakar and Showmen Saha, (5th - 6th June 2013), Behaviour of concrete bridge deck for variable spacing of longitudinal girder, International conference on Sustainable Innovative Techniques in Civil and Environmental Engineering, [International Journal of Civil Engineering and Applications, Vol.3, No. 07Spl, June 2013], pp 93-9 JNU-New Delhi, India | 2013 |
2013 | 25. Subashini Rajaram, Somnath Karmakar, Amit Shaw and Showmen Saha, (5th - 6th June 2013), Review of smooth particle hydrodynamics (SPH) method in light of structures, International conference on Sustainable Innovative Techniques in Civil and Environmental Engineering, [International Journal of Civil Engineering and Applications, Vol.3, No. 07Spl, June 2013], pp 77-85 JNU-New Delhi, India | 2013 |
2013 | 26. Piyali Basu, Somnath Karmakar, Amit Shaw and Showmen Saha, (7th - 9th February 2013), The Response of shear wall with protective barrier under blast loading, National Symposium on Sustainable Infrastructure Development, pp 267-274 IIT Bhubaneswar, Orisha, India | 2013 |
2013 | 27. Somnath Karmakar, Amit Shaw and Showmen Saha, (7th - 9th February 2013), Response of concrete bridge under blast load, National Symposium on Sustainable Infrastructure Development, pp 38-45 IIT Bhubaneswar, Orisha, India | 2013 |
2013 | 28. Arpita Das, Somnath Karmakar and Showmen Saha, (7th - 9th February 2013), Strengthening of concrete column using glass fibre reinforced polymer, National Symposium on Sustainable Infrastructure Development, pp 30-37. IIT Bhubaneswar, Orisha, India | 2013 |
2012 | 29. Somnath Karmakar, Amit Shaw and Showmen Saha, (12th-13th October 2012), A review of blast loading and blast effects on structure, International Conference on Safety, International conference on safety, pp 35-36 IIT Gandhinagar, Gujarat, India | 2012 |
2011 | 30. Kanchan Sengupta and Somnath Karmakar, (21st – 23rd October 2011), Investigations on simply supported concrete bridge deck slab for IRC vehicle loading using finite element analysis, International conference on Advances in Civil Engineering, [International Journal of Earth Science and Engineering” Vol. 04, No 06Spl, October 2011)], pp 716-719. K L University, Andhra Pradesh, India | 2011 |
ID | Title |
---|---|
Bittu Ghosh and Somnath Karmakar, (3rd – 5th March 2023), Barriers to implementation in BIM Construction in the Indian Bridge construction sphere, International conference on Recent developments in sustainable infrastructure: Engineering, Technology & Innovation: 2024: xxx-xxxx (Springer Nature Singapore Pte Ltd. 2024) |
1. Bittu Ghosh and Somnath Karmakar, (3rd – 5th March 2023), Barriers to implementation in BIM Construction in the Indian Bridge construction sphere, International conference on Recent developments in sustainable infrastructure: Engineering, Technology & Innovation: 2024: xxx-xxxx (Springer Nature Singapore Pte Ltd. 2024) |
Puja Haldar, Somnath Karmakar, and Souvik Roy, Effect of super Cyclone AMPHAN on Structure: A Case study, Lecture Notes in Civil Engineering, 2023: 229–241, http://dx.doi.org/10.1007/978-981-19-9913-0, (Springer Nature Singapore Pte Ltd. 2023). |
2. Puja Haldar, Somnath Karmakar, and Souvik Roy, Effect of super Cyclone AMPHAN on Structure: A Case study, Lecture Notes in Civil Engineering, 2023: 229–241, http://dx.doi.org/10.1007/978-981-19-9913-0, (Springer Nature Singapore Pte Ltd. 2023). |
Poulomee Roy, Indrani Chattopadhyay, and Somnath Karmakar, Investigation of the Aerodynamic Phenomenon on a Box-Cell Highway Bridge with Varying Wind Attack Angles Using Incompressible Computational Fluid Dynamics, Lecture Notes in Mechanical Engineering, 2023: 615–625, http://dx.doi.org/10.1007/978-981-19-7709-1_62, (Springer Nature Singapore Pte Ltd. 2023). |
3. Poulomee Roy, Indrani Chattopadhyay, and Somnath Karmakar, Investigation of the Aerodynamic Phenomenon on a Box-Cell Highway Bridge with Varying Wind Attack Angles Using Incompressible Computational Fluid Dynamics, Lecture Notes in Mechanical Engineering, 2023: 615–625, http://dx.doi.org/10.1007/978-981-19-7709-1_62, (Springer Nature Singapore Pte Ltd. 2023). |
Indrani Chattopadhyay, Poulomee Roy, and Somnath Karmakar, Determination of Pressure and Force Coefficient of Bridges due to Wind: Practical Investigation and Simulation Using LS-DYNA, Lecture Notes in Mechanical Engineering, 2023: 605–613, http://dx.doi.org/10.1007/978-981-19-7709-1_61 (Springer Nature Singapore Pte Ltd. 202 |
4. Indrani Chattopadhyay, Poulomee Roy, and Somnath Karmakar, Determination of Pressure and Force Coefficient of Bridges due to Wind: Practical Investigation and Simulation Using LS-DYNA, Lecture Notes in Mechanical Engineering, 2023: 605–613, http://dx.doi.org/10.1007/978-981-19-7709-1_61 (Springer Nature Singapore Pte Ltd. 202 |
ID | Details | Patent Filed Year |
---|
iv). Member of West Bengal State Technical Agency (WBSTA) for facilitating the scrutiny of project proposals under the Pradhan Mantri Gram Sadak Yojana (PMGSY): Ministry of Rural Development, Government of India.
iii). Indian Roads Congress, LM (42090)
ii). GATE-2005: All India Rank 910 & Percentile Score 89.76
i). Scholarship & Stipend holder @ Secondary Examination, 1995
S N |
Section/office/ Institute level committee |
From |
To |
Position held |
Responsibilities
|
15. | Institute | 13.11.2024 | Nodal Faculty Member |
Bureau of Indian Standard, Govt of India |
|
14. |
Institute |
25.02.2020 |
23.02.2024 |
Member (Civil) |
Construction and PMQCC |
13. |
Institute |
09.04.2018 |
One time |
Member Convener |
Reconstruction of the missing files of U.G. Tank |
12. |
Maintenance Section |
13.03.2018 |
31.10.2021 |
Faculty In-Charge |
Maintenance Section (Civil) |
11. |
Establishment section |
18.12.2017 |
21.09.2022 |
Member |
Post Based Reservation Rouster for staff |
10. |
Establishment section |
21.09.2017 |
01.11.2023 |
Chairman |
Chairman of purchase committee: Director Bungalow, guest House, Establishment section |
09. |
Medical Unit |
30.08.2017 |
One time |
Member |
Tender Cum Local Purchase Committee |
08. |
Maintenance Section |
12.01.2016 |
12.03.2018 |
Technical Advisor |
Maintenance Section (Civil) |
07. |
Institute |
18.09.2014 |
23.03.2015 |
Member |
Internal Finance Committee |
06. |
Academic Section |
05.09.2014 |
04.09.2017 |
Faculty In-Charge |
Academic and Examinations |
05. |
Institute |
22.01.2014 |
21.01.2016 |
Member |
B.O.G. |
04. |
Institute |
26.02.2013 |
One time |
Member |
Central Purchase Committee |
03. |
Academic Section |
05.09.2012 |
04.09.2014 |
Professor In-Charge Examinations |
Academic and Examinations |
02. |
Physical Training Department |
02.07.2012 |
One time |
Technical Expert |
Sports development works at different halls |
01. |
Institute |
04.11.2011 |
One time |
Member |
Escalation Committee of Capacity Expansion of Hostel No. 1, 2 & 5. |
Off line:
Room No. CE03, Department of Civil Engineering, NIT Durgapur, India-713209
Online:
Mobile : +91-9434788155(O), +919434375887 (P) & +91-3432754187 (O)
Email : skarmakar.ce@nitdgp.ac.in, structure.som07@gmail.com
ORCID:
https://orcid.org/0000-0001-7622-9555
Continuing Educations
03). Safe and Sustainable Road Construction and Current Trends (SSRCCT -2024) on 01.04.2024 to 06. 01.2024)
02). Enhancing Pedagogy Skills on 16.03.2009 to 20.03.2009
01). Enhancing Pedagogy Skills on 23.02.2009 to 27.02.2009
Outreach Activity
12). Reviewer to Environmental Engineering and Management Journal (Gheorghe Asachi” Technical University of Iași, Romania)
11). Reviewer to Computers and Structures (Elsevier Ltd)
10). Reviewer to Buildings (MDPI)
09). Reviewer to International Journal of Environmental Research and Public Health (MDPI)
08). Reviewer to Journal of Asian Architecture and Building Engineering (Taylor & Francis)
07). Reviewer to Structural Engineering and Mechanics, An International Journal (Techno-Press)
06). Reviewer to Journal of Infrastructure Systems (ASCE)
05). Reviewer to 13th Structural Engineering Convention (VNIT Nagpur)
04). Reviewer to Wind and Structures, An International Journal (Techno-Press)
03). Reviewer to Journal of Vibration and Control (SAGE)
02). Reviewer to Indian Concrete Journal (ACC)
01). Reviewer to Journal of the Institute Engineers (India): Series A (Springer)
DSC Members
01). Saikat Suvra Mondal @ , 02). Sudipta Ghosh @ 19CE1103, 03). Soumya Mukherjee @ 19CE1104, 04). Sukamal Kanta Ghosh @ 21CE1105, 05). Suktiprajna Rath @ 22CE1104, 06). Shreyasee S Sanjay @ 22CE1105, 07). Sourav Sarkhel @ 23CE1102, 08). Arindam Prasad Sinha @ 23CE1103, 09). Sourav Dutta @ 23CE1104
01). Kanchan Sengupta @ 09CE410, 02). Needhi Kotoky @ 10CE402, 03). Piyali Basu @ 11CE408, 04). Asim Mukherjee @ 12CE401, 05). Subashini Rajaram @ 12CE407, 06). Goutam Kuti @ 13CE402, 07). Subhash Chandra Bhusan @ 13CE410, 08). Dasari Sudheer Kumar @ 14CE402, 09). Pallavi Rai @ 14CE416, 10). Rajnesh Kumar @ 14CE467, 11). Aakash Rawal @ 15CE408, 12). Indrani Chattopadhyay @ 15CE413, 13). Sumit Bordhan @ 16CE4104, 14). Rupak Mazumdar @ 16CE4117, 15). Anusua Sen @ 17CE4101, 16). Pritha Roy @ 17CE4115, 17). Raju Sarkar @ 18CE4110, 18). Chilipili Adithya @ 18CE4111, 19). Prithwish Kundu @ 19CE41109, 20). Umesh Gupta @ 20CE4105, 21). Goutam Kumar @ 20CE4116, 22). Samir Kumar @ 21CE4103, 23). Soumyajit Ghosh @ 22CE4105, 24). Subhashish Prasad @ 22CE4114, 25). Satyamjit Vishwakarma @ 23CE4104, 26). Arun Kumar @ 23CE4114
01). Anjan Majee @ 06CE21, 02). Mrinal Kanti Dutta @ 06CE23, 03). Anirban Mondal @ 07CE09, 04). Rishi Nalamwar @ 07CE33, 05). Arindam Dhar @ 08CE46, 06). Mandakini Chowdhury @ 08CE47, 07). Mithil Mazumder @ 08CE48, 08). Dhriti Kundu @ 09CE10, 09). Rahul Suryodai @ 09CE45, 10). Trina Kamalika Chowdhury @ 09CE52, 11). Md. Tarik Rafsan Majaharie @ 10CE19, 12). Indranath Biswas @ 10CE28, 13). Vivekananda @ 10CE40, 14). Kundan Kumar @ 10CE49, 15). Miaaza Hussain @ 10CE61, 16). Abu Jafor Middya @ 11CE19, 17). Himanshu Jha @ 11CE20, 18). Amit Singh Negi @ 11CE40, 19). Uddipto Ghosh @ 12CE09), 20). Arsad Neyaz @ 12CE12, 21). Kaunteyesh Singh @ 12CE22, 22). Jhungeer Bibi Ameera @ 12CE65, 23). Ravi Kumar Jangid @ 13CE31, 24). Soumyadeep Mondal @ 13CE46, 25). Pemmasani Sambasivarao @ 13CE59, 26). Leckhraj Luchoomun @ 13CE62, 26). N.Manesha Manoon mani @ 14CE56, 28). Tshewang Peldon @ 14CE64, 29). Karma Tashi Jamtsho @ 14CE67, 30). Gaurav Kumar @ 14CE68, 31). Swarnika Chandra @ 13CE18, 32). Narendranath Das @ 15CE02, 33). Riya Mondal @ 15CE07, 34). Somu Sandeep Reddy @ 15CE51, 35). Ankan Ata @ 15CE55), 36). Poulome Roy @ 16CE8008, 37). J Ramakrishna @ 16CE8009, 38). Vivek Raj @ 16CE8014, 39). Moluguri Harsha Vardhan @ 17CE8040, 40). Ajit Gupta @ 17CE8041, 41). Bendi Venkatesh @ 17CE8042, 42). Aneek Biswas @ 17CE8058, 43). Bindas R Jorwal @ 18CE8021, 44). Kalluri Rajashekar Reddy @ 18CE8031, 45). D Sai Kowshik @ 18CE8035, 46). Jayachandra Naragana @ 18CE8037, 47). Satyam Shorya Jha @ 19CE8002, 48). Srijan Saha @ 19CE8025, 49). Koena Saha @ 19CE8044, 50). Aritro Ghosh @ 20CE8035, 51). Gourish Maitra @ 20CE8062, 52). Prathi Sai Durga Bhavani @ 20CE8073, 53). Sudheer Kumar Guri @ 20CE8078, 54). Ankita Ghosh @ 21CE8020, 55). Nirbheek Ghosh @ 21CE8024, 56). Yash Paswan @ 21CE8058, 57). L. Sanjana @ CE218080