Civil Engineering

Faculty Details

Somnath Karmakar, Ph.D. Assistant Professor (Grade-I)
Joined the Institute in 12.10.2007
skarmakar[dot]ce[at]nitdgp[dot]ac[dot]in
Education

Ph.D. in Engineering (I.I.T. Kharagpur @ 05.01.2015 - 10.10.2018)

M.Tech in Structural Engineering (N.I.T. Durgapur @ 2005 - 2007)

B.Tech in Civil Engineering (Jalpaiguri Govt Eng. College @ 2002 - 2005)

Diploma in Civil Engineering (A. P. C. Roy Polytechnic, Jadavpur @ 1999 - 2002)

Higher Secondary (Kashiram Das Institution, Katwa @ 1997)

Secondary (Kashiram Das Institution, Katwa @ 1995)

Work Experiences

3). Assistant Professor Grade-I (Level 12) : 27.06.2022 to till date

2). Assistant Professor Grade-II (Level 11) : 12.10.2012 to 26.06.2022

1). Assistant Professor Grade-II (Level 10) : 12.10.2007 to 11.10.2012

Research Interest

1). Blast impact (FEM-SPH Coupling) on bridges/structures/mines

2). Wind impact (CFD) on bridges/structures

3). Retrofitting, Quality Control, and  Construction management for bridges/structures

 

 

Projects
      R & D / Consultancy Projects Investigator Co-investigator Sponsered Agency Duration Status

    Effect of Explosive Reactive Armour on Bridges under blast loading

 

Dr. Somnath Karmakar NIL NIT Durgapur

 

2 years

Completed
           

 

Teachings

Odd Semester (2024-2025) @ 12 hrs.

P.G.

i). Advanced Reinforced Concrete (CE 1002), Full @ 4 hrs

U.G.

i). Building Construction and Concrete Technology (CEC 303), Half @ 2 hrs

ii). Structural Analysis-II Sessional (CES 551), Full @ 3 hrs

iii). Civil Engineering drawing Sessional (CES352), Full @ 3 hrs

Even Semester (2024-2025) @ 8 hrs.

P.G.

i). Advanced Bridge Engineering (CE 9033), Full @ 3 Hrs 

U.G.

i). Design of Concrete Structures (CEC402), Half @ 2 hrs

ii). Design of Concrete Structure Sessional (CES452), Full @ 3 hrs

UG Students

B.Tech Project Students

B.Tech Project Students

53 nos completed + 4 nos ongoing
Students list are available at Miscellaneous icon
Civil Engineering
B.Tech Project Students

B.Tech Project Students

53 nos completed + 4 nos ongoing

Civil Engineering

PG Students

M.Tech Project (Structural Engineering) Students

M.Tech Project (Structural Engineering) Students

24 nos completed + 2 nos ongoing
Students list are available at Miscellaneous icon
Blast loading on Bridge using FEM-SPH coupled Computational Framework 
M.Tech Project (Structural Engineering) Students

M.Tech Project (Structural Engineering) Students

24 nos completed + 2 nos ongoing

Blast loading on Bridge using FEM-SPH coupled Computational Framework 

Students list are available at Miscellaneous icon

Doctoral Students

01). Shuvra Saha [ss.19ce1101@phd.nitdgp.ac.in]

01). Shuvra Saha [ss.19ce1101@phd.nitdgp.ac.in]

Ongoing Full Time Ph.D. Scholar (SRF)
(1). Enrollment: 26.07.2019 (Single Supervisor)     (2). Registration: 24.09.2021 (21RCE073)    (3). Enhancement: 01.07.2022  (4). Pre-submission Seminar: 06.12.2024 (5). Thesis submission: 23.12.2024 (6). Defence: 00.00.0000 (7). Accepted/Published: 2 (Conference), 0 (Book Chapter), and 2 (SCI/SCOPUS  Indexing Journal)
Computer simulation of bridges in reducing the dynamic impacts and failure modes under contact explosion using FEM-SPH Coupling and non-Explosive Reactive Armour                                                                                                                                                                                                                  
01). Shuvra Saha [ss.19ce1101@phd.nitdgp.ac.in]

01). Shuvra Saha [ss.19ce1101@phd.nitdgp.ac.in]

Ongoing Full Time Ph.D. Scholar (SRF)

(1). Enrollment: 26.07.2019 (Single Supervisor)     (2). Registration: 24.09.2021 (21RCE073)    (3). Enhancement: 01.07.2022  (4). Pre-submission Seminar: 06.12.2024 (5). Thesis submission: 23.12.2024 (6). Defence: 00.00.0000 (7). Accepted/Published: 2 (Conference), 0 (Book Chapter), and 2 (SCI/SCOPUS  Indexing Journal)

Computer simulation of bridges in reducing the dynamic impacts and failure modes under contact explosion using FEM-SPH Coupling and non-Explosive Reactive Armour                                                                                                                                                                                                                  
02). Puja Haldar [ph.19ce1103@phd.nitdgp.ac.in]

02). Puja Haldar [ph.19ce1103@phd.nitdgp.ac.in]

Thesis submitted on 28.06.2024
(1). Enrollment: 26.07.2019 (Single Supervisor)   (2). Registration: 18.09.2020 (20RCE053)    (3). Enhancement: 30.08.2021 (4). Pre-submission Seminar: 20.05.2024 (5). Thesis submission: 28.06.2024 (6). Defence: 00.00.0000 (7). Accepted/Published: 3 (Conference), 1 (Book Chapter), and 7 (SCI/SCOPUS  Indexing Journal)   
Effects of Wind Induced Vibrations on highway bridge deck and their mitigations                                                                                                                                                                
02). Puja Haldar [ph.19ce1103@phd.nitdgp.ac.in]

02). Puja Haldar [ph.19ce1103@phd.nitdgp.ac.in]

Thesis submitted on 28.06.2024

(1). Enrollment: 26.07.2019 (Single Supervisor)   (2). Registration: 18.09.2020 (20RCE053)    (3). Enhancement: 30.08.2021 (4). Pre-submission Seminar: 20.05.2024 (5). Thesis submission: 28.06.2024 (6). Defence: 00.00.0000 (7). Accepted/Published: 3 (Conference), 1 (Book Chapter), and 7 (SCI/SCOPUS  Indexing Journal)   

Effects of Wind Induced Vibrations on highway bridge deck and their mitigations                                                                                                                                                                
03). Goutam Kuti [gk.19ce1501@phd.nitdgp.ac.in]

03). Goutam Kuti [gk.19ce1501@phd.nitdgp.ac.in]

Ongoing Part Time Ph.D. Scholar (SRF)
(1). Enrollment: 26.07.2019 (Single Supervisor)      (2). Registration: 12.11.2021 (21RCE078)    (3). Enhancement: NA (4). Pre-submission Seminar: 00.00.0000 (5). Thesis submission: 00.00.0000 (6). Defence: 00.00.0000  (7). Accepted/Published: 0 (Conference), 0 (Book Chapter), and 2 (SCI/SCOPUS  Indexing Journal)  
Effect of the non-Explosive Reactive armour over highway bridges under contact blasts using FEM-SPH Coupled Computational Framework  
03). Goutam Kuti [gk.19ce1501@phd.nitdgp.ac.in]

03). Goutam Kuti [gk.19ce1501@phd.nitdgp.ac.in]

Ongoing Part Time Ph.D. Scholar (SRF)

(1). Enrollment: 26.07.2019 (Single Supervisor)      (2). Registration: 12.11.2021 (21RCE078)    (3). Enhancement: NA (4). Pre-submission Seminar: 00.00.0000 (5). Thesis submission: 00.00.0000 (6). Defence: 00.00.0000  (7). Accepted/Published: 0 (Conference), 0 (Book Chapter), and 2 (SCI/SCOPUS  Indexing Journal)  

Effect of the non-Explosive Reactive armour over highway bridges under contact blasts using FEM-SPH Coupled Computational Framework  
04). Taniya Saha [ts.20ce1101@phd.nitdgp.ac.in]

04). Taniya Saha [ts.20ce1101@phd.nitdgp.ac.in]

Ongoing Full Time Ph.D. Scholar (SRF)
(1). Enrollment: 07.10.2020 (Single Supervisor)  (2). Registration: 28.09.2022 (22RCE079) (3). Enhancement: 27.09.2023  (4). Pre-submission Seminar: 00.00.0000 (5). Thesis submission: 00.00.0000 (6). Defence: 00.00.0000 (7). Accepted/Published: 2 (Conference), 0 (Book Chapter), and 1 (SCI/SCOPUS  Indexing Journal)
Numerical and statistical investigation of vertical slender structures through wind spectrum                                                                                                                                                                                                     
04). Taniya Saha [ts.20ce1101@phd.nitdgp.ac.in]

04). Taniya Saha [ts.20ce1101@phd.nitdgp.ac.in]

Ongoing Full Time Ph.D. Scholar (SRF)

(1). Enrollment: 07.10.2020 (Single Supervisor)  (2). Registration: 28.09.2022 (22RCE079) (3). Enhancement: 27.09.2023  (4). Pre-submission Seminar: 00.00.0000 (5). Thesis submission: 00.00.0000 (6). Defence: 00.00.0000 (7). Accepted/Published: 2 (Conference), 0 (Book Chapter), and 1 (SCI/SCOPUS  Indexing Journal)

Numerical and statistical investigation of vertical slender structures through wind spectrum                                                                                                                                                                                                     
05). Bittu Ghosh [bg.20ce1104@phd.nitdgp.ac.in]

05). Bittu Ghosh [bg.20ce1104@phd.nitdgp.ac.in]

Ongoing Full Time Ph.D. Scholar (SRF)
(1). Enrollment: 07.10.2020 (Single Supervisor)  (2.) Registration: 28.09.2022 (22RCE080)  (3). Enhancement: 26.09.2023 (4). Pre-submission Seminar: 00.00.0000 (5). Thesis submission: 00.00.0000 (6). Defence: 00.00.0000  (7). Accepted/Published: 2 (Conference), 1 (Book Chapter), and 3 (SCI/SCOPUS  Indexing Journal)
Exploring Construction Practices for Resource Optimization in the transportation sector to Enhance Productivity and Profitability
05). Bittu Ghosh [bg.20ce1104@phd.nitdgp.ac.in]

05). Bittu Ghosh [bg.20ce1104@phd.nitdgp.ac.in]

Ongoing Full Time Ph.D. Scholar (SRF)

(1). Enrollment: 07.10.2020 (Single Supervisor)  (2.) Registration: 28.09.2022 (22RCE080)  (3). Enhancement: 26.09.2023 (4). Pre-submission Seminar: 00.00.0000 (5). Thesis submission: 00.00.0000 (6). Defence: 00.00.0000  (7). Accepted/Published: 2 (Conference), 1 (Book Chapter), and 3 (SCI/SCOPUS  Indexing Journal)

Exploring Construction Practices for Resource Optimization in the transportation sector to Enhance Productivity and Profitability
06). Pawan Kumar Das [pkd.22ce1107@phd.nitdgp.ac.in]

06). Pawan Kumar Das [pkd.22ce1107@phd.nitdgp.ac.in]

Ongoing Full Time Ph.D. Scholar (JRF)
(1). Enrollment: 29.08.2022 (Single Supervisor)   (2). Registration: 29.08.2023 (23RCE066)  (3). Enhancement: 00.00.0000 (4). Pre-submission Seminar: 00.00.0000 (5). Thesis submission: 00.00.0000 (6). Defence: 00.00.0000 (7). Accepted/Published: 0 (Conference), 0 (Book Chapter), and 0 (SCI/SCOPUS Indexing Journal)
Response of soil in the protection of structures under blast using FEM-SPH Coupled Computational Frame Works
06). Pawan Kumar Das [pkd.22ce1107@phd.nitdgp.ac.in]

06). Pawan Kumar Das [pkd.22ce1107@phd.nitdgp.ac.in]

Ongoing Full Time Ph.D. Scholar (JRF)

(1). Enrollment: 29.08.2022 (Single Supervisor)   (2). Registration: 29.08.2023 (23RCE066)  (3). Enhancement: 00.00.0000 (4). Pre-submission Seminar: 00.00.0000 (5). Thesis submission: 00.00.0000 (6). Defence: 00.00.0000 (7). Accepted/Published: 0 (Conference), 0 (Book Chapter), and 0 (SCI/SCOPUS Indexing Journal)

Response of soil in the protection of structures under blast using FEM-SPH Coupled Computational Frame Works
07). Krishnendu Chowdhury [kc.24ce1502@nitdgp.ac.in]

07). Krishnendu Chowdhury [kc.24ce1502@nitdgp.ac.in]

Ongoing Part Time Ph.D. Scholar (JRF)
(1). Enrollment: 01.08.2024 (Single Supervisor)   (2). Registration: 00.00.00000    (3). Enhancement: N.A. (4). Pre-submission Seminar: 00.00.0000 (5). Thesis submission: 00.00.0000 (6). Defence: 00.00.0000 (7). Accepted/Published: 0 (Conference), 0 (Book Chapter), and 0 (SCI/SCOPUS Indexing Journal)
Residual capacity of blast damaged multi-spans RC bridge using FEM-SPH based numerical simulation 
07). Krishnendu Chowdhury [kc.24ce1502@nitdgp.ac.in]

07). Krishnendu Chowdhury [kc.24ce1502@nitdgp.ac.in]

Ongoing Part Time Ph.D. Scholar (JRF)

(1). Enrollment: 01.08.2024 (Single Supervisor)   (2). Registration: 00.00.00000    (3). Enhancement: N.A. (4). Pre-submission Seminar: 00.00.0000 (5). Thesis submission: 00.00.0000 (6). Defence: 00.00.0000 (7). Accepted/Published: 0 (Conference), 0 (Book Chapter), and 0 (SCI/SCOPUS Indexing Journal)

Residual capacity of blast damaged multi-spans RC bridge using FEM-SPH based numerical simulation 

Projects

Sl.No. Title Name of the PI Name of the CoPIs Funding Agency Amount (Rs.) Project Type Project Status Date of Initiation Date of Completion
1 154). Proof checking of 2 nos bridges under S. E. R. between Narayangarh and Bhadrak Section without site visits Dr. Somnath Karmakar NIL Private Consultancy Ongoing 2024-12-05
2 156). Proof checking of 11 nos bridges under ECR between Madhubani to Sagauli Section without site visits Dr. Somnath Karmakar NIL Rail Consultancy Ongoing 2024-11-26
3 155). Safety checking RCC bridge, approach road, Guide bund and protection works without site visits Dr. Somnath Karmakar NIL Private Consultancy Ongoing 2024-11-20
4 153). Proof checking of the mix designs of M15, 20, 25, 30 & 35 Dr. Somnath Karmakar NIL Private Consultancy Ongoing 2024-09-19
5 151). Proof checking of the structural design and drawings for the construction of 91.0 m span steel truss bridge under GTA_WBSRDA Kalimpong, with site visits Dr. Somnath Karmakar NIL Private Consultancy Ongoing 2024-08-29 2024-12-18
6 150). Proof checking of the construction of 4 lane ROB and its approach road at Ekangarsarai at NH33 Dr. Somnath Karmakar NIL Private Consultancy Ongoing 2024-08-29 2024-10-29
7 148). Proof checking of design and drawings for Form-work of ORP at AF STN CHABUA under MES Dr. Somnath Karmakar NIL MES Consultancy Ongoing 2024-07-22 2024-08-28
8 147). Proof checking of the structural design and drawings of a Road and Bridge near Upper Cart Road under GTA_WBSRDA Kalimpong Dr. Somnath Karmakar NIL GOI Consultancy Ongoing 2024-07-22 2024-11-07
9 149). Proof checking of design and drawings of 20 nos. bridges in Samastipur Division under EC Indian Railway Dr. Somnath Karmakar NIL Rail Consultancy Ongoing 2024-06-27
10 145). Proof checking of design and drawings of the Stripping Shed for Loco shop Wagon at Jamalpur Railway workshop Dr. Somnath Karmakar NIL Rail Consultancy Ongoing 2024-06-27 2024-07-03
11 152). Safety checking of 9 nos Over Head Reservoir at various places of Murshidabad district under P. H. Engineering Department, Govt of WB Dr. Somnath Karmakar NIL GoWB Consultancy Ongoing 2024-06-22
12 146). Proof checking of design and drawings of G+6 residential building and earth retaining structure of Oil India houshing at, Gwuahati Dr. Somnath Karmakar NIL MES Consultancy Completed 2024-06-12 2024-08-30
13 144). Proof checking of design and drawings of 500 dia MS water pipe line support and girder over subway spans 10 m and 18 m at Kharagpur Dr. Somnath Karmakar NIL Private Consultancy Ongoing 2024-05-02 2024-05-09
14 143). Proof checking of design and drawings of various structures of ROB in lieu of level crossing no 47c in under Malda division Dr. Somnath Karmakar NIL Rail Consultancy Ongoing 2024-05-02 2024-05-24
15 142). Slope stability analysis of the earthen slope from land sliding at Gangtak under MES Dr. Somnath Karmakar Plus Two MES Consultancy Ongoing 2024-02-19 2024-04-04
16 141). Proof checking of structural design and drawing 3 nos bridges, one no foothpath and trolly refuge and one embankment under IR Dr. Somnath Karmakar NIL Rail Consultancy Ongoing 2024-02-19 2024-03-02
17 140). Proof checking of structural design and drawing of substructures and foundations for 5 nos bridges under IR Dr. Somnath Karmakar NIL Rail Consultancy Ongoing 2024-02-13 2024-03-21
18 139). Safety checking of the ROB of bow-string girder of 64.60 m span under NH81 Dr. Somnath Karmakar NIL GDCL Consultancy Ongoing 2023-12-20 2024-01-09
19 Proof checking of the G+7 building proven of deficient married ACCN at Bangalore, Dr. Somnath Karmakar NIL Air Force Consultancy Ongoing 2023-09-19 2023-09-29
20 Proof checking of the sructural design and drawing of Industrial building at Indore Dr. Somnath Karmakar Two Private Consultancy Ongoing 2023-09-15 2023-10-12
21 Proof checking of a commertial building (G + 0) at Tezpur Dr. Somnath Karmakar NIL Private Consultancy Ongoing 2023-08-07 2023-08-12
22 Raft foundation and retaining wall for Igloo structure, Kathihar @ MES Dr. Somnath Karmakar NIL Private Consultancy Completed 2023-07-10 2023-07-12
23 Proof checking of structural design and drawing of different ROB of Dhanbad under ECR Dr. Somnath Karmakar NIL Rail Consultancy Completed 2023-06-20 2023-06-27
24 Erection and launching scheme of 60 m span for proposed ROB no. 382 at 137/24-27 KM, and 30.5 m span for proposed ROR no. 30B Dr. Somnath Karmakar NIL Private Consultancy Completed 2023-06-12 2023-06-16
25 Design and drawing of the protective wall basket under Indian Army Dr. Somnath Karmakar NIL MES Consultancy Completed 2023-06-05 2023-06-07
26 Site visit and report development for an all-weather usable condition certificate cum Building Safety Certificate for a Private School at Durgapur Dr. Somnath Karmakar NIL Private Consultancy Completed 2023-05-23 2023-05-25
27 Physical site visit to check the old RC overhead water tank at Satitara and Gokarna under WB PHE Department Dr. Somnath Karmakar NIL GoWB Consultancy Completed 2023-04-17 2023-05-15
28 Proof checking of the G+3 buildings and site visit for safety audit of the same of a college, Durgapur Dr. Somnath Karmakar NIL Private Consultancy Completed 2023-04-17 2023-07-31
29 Design and safety of special 'OHE' supporting portal structure of 48m span suitable for holding load of 15 nos. OHE Dr. Somnath Karmakar NIL Rail Consultancy Completed 2023-04-13 2023-05-04
30 Proof checking of the structural design & drawing of buildings under the NEC of India Dr. Somnath Karmakar NIL NEC @ GoI Consultancy Completed 2023-03-16 2023-06-16
31 Proof checking of erection & launching scheme of 30.5 m RDSO standard steel superstructure under KGP Division Dr. Somnath Karmakar NIL Rail Consultancy Completed 2023-03-15 2023-03-19
32 Proof checking of Structural drawing and design for its stability of a relocatable Fast Erecting Modular Shelter Dr. Somnath Karmakar NIL GoI Consultancy Completed 2023-03-10 2023-05-18
33 Physical site visit to an RC overhead water tank at Berhampur Dr. Somnath Karmakar NIL GoWB Consultancy Completed 2023-01-31 2023-06-23
34 Safety checking of one flyover and one major bridge on NH-730 under GoUP PWD Dr. Somnath Karmakar NIL GoUP Consultancy Completed 2023-01-18 2023-06-11
35 Proof checking of the erection & launching scheme of 30 and 24 m for ROB over SH 5, WB Dr. Somnath Karmakar NIL Private Consultancy Completed 2022-12-28 2023-01-11
36 Consultancy on the mix design of M30 grade of concrete for special use Dr. Somnath Karmakar NIL Private Consultancy Completed 2022-11-29 2023-01-25
37 Proof checking of a 30 m span steel bridge superstructure in Sikkam, GoS Dr. Somnath Karmakar NIL GoSK Consultancy Completed 2022-11-18 2022-12-01
38 Safety audit of an old brick masonry Govt building at Asansol Dr. Somnath Karmakar NIL GoWB Consultancy Completed 2022-11-05 2022-11-15
39 Substructure of a ROB over LC Gate No. CA26 under NFR Dr. Somnath Karmakar NIL Rail Consultancy Completed 2022-09-26 2023-05-04
40 Road safety audit of NH-31 from 00.00 KM to 27.50 KM Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2022-08-01 2023-01-12
41 Proof checking of the design and drawing of the 4 - lane ROB and its Approaches at KM 41.760 of NH-2B in the State of west Bengal and Proof checking of erection scheme of railway girders Dr. Somnath Karmakar NIL Rail Consultancy Completed 2022-04-26 2024-02-04
42 Proof checking of construction of 04xLRC IGLOO storage ACCN for the Military station Dr. Somnath Karmakar NIL MES Consultancy Completed 2022-04-25 2022-04-29
43 Proof checking of bridge design and drawing for Intake well over river Ajay Dr. Somnath Karmakar NIL Shyam Sel and Power Limited Consultancy Completed 2022-04-04 2022-05-27
44 Proof checking of the G + 2 type officers quarter in LGSF technology of IOCL Dr. Somnath Karmakar NIL IOCL Consultancy Completed 2022-04-04 2022-04-09
45 Proof checking of 20 m span steel bridge superstructure along Chuba Khola at Sikkam Dr. Somnath Karmakar NIL Private Consultancy Completed 2022-03-29 2022-04-06
46 Proof checking of the pile Integrity test at Rajarhat-Newtown campus under Housing board, WB Dr. Somnath Karmakar NIL GoWB Consultancy Completed 2022-03-23 2022-02-17
47 Mix design of M30 grade of concrete Dr. Somnath Karmakar NIL Private Consultancy Completed 2022-01-24 2022-02-12
48 Proof checking of the Erection & launching scheme of 36 m bow string girder between Kharagpur to Hijli for 3Rd line Dr. Somnath Karmakar NIL Rail Consultancy Completed 2021-11-02 2021-11-29
49 Safety checking of Kendriya Vidyalaya Asansol Dr. Somnath Karmakar NIL Kendriya Vidyalaya Consultancy Completed 2021-08-05 2021-08-27
50 Proof checking of the design of a new shed near test shed at CLW, E.R. Dr. Somnath Karmakar NIL CLW Consultancy Completed 2021-06-25 2021-07-17
51 Proof checking of ROB of NH-82 under BSRDCL Dr. Somnath Karmakar NIL BSRDCL and NHIA Consultancy Completed 2021-06-18 2021-10-01
52 Proof checking of G+1 building at central University Jharkhand Dr. Somnath Karmakar NIL GoI Consultancy Completed 2021-04-23 2021-06-11
53 Proof checking of 2 nos bridges over NH-31C Dr. Somnath Karmakar NIL NHIA Consultancy Completed 2021-04-23 2021-07-05
54 Proof checking of a steel structural shed of 2400 sqm Dr. Somnath Karmakar NIL Private Consultancy Completed 2021-04-07 2021-04-21
55 Erection & launching scheme of 32.5 m composite girder of ROB on KGP-Tata Section Dr. Somnath Karmakar NIL Rail Consultancy Completed 2021-03-10 2021-03-12
56 Proof checking of the design and drawing of NH 44A from Ch. 0.000 to 16.290 km Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2021-01-27 2021-07-15
57 Proof checking of the design and drawing of 45 nos bridges’ substructures and foundation under SE Railway Dr. Somnath Karmakar NIL Rail Consultancy Completed 2021-01-01 2022-04-07
58 Proof checking of the design and drawing of the Bow-String substructure and foundation of ROB of NH-82 Dr. Somnath Karmakar NIL BSRDCL and NHIA Consultancy Completed 2020-12-17 2021-10-01
59 Proof checking of the design and drawing of the superstructure at NH-33 Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2020-11-13 2020-12-10
60 Proof checking of the design and drawing for retrofitting and redevelopment of smart city network Dr. Somnath Karmakar NIL GoI @ Smart City Authority Consultancy Completed 2020-10-15 2021-06-28
61 Proof checking of the design and drawing of 2 nos superstructure & Pier Cap of Major Bridge at NH-33 Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2020-08-17 2021-02-20
62 Proof checking of the design and drawing of 2 lanes roads for widening and improvement of NH-75 Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2020-07-22 2020-08-17
63 Proof checking of the design and drawing of the structural shed of Hindustan Aeronautics Limited (HAL) Dr. Somnath Karmakar NIL HAL Consultancy Completed 2020-07-01 2020-07-30
64 Mix design of M25 & M35 grade of concrete Dr. Somnath Karmakar NIL Private Consultancy Completed 2020-02-28 2020-06-05
65 Consultancy on cracks checking for G + 4 storied residential building by NDT checks Dr. Somnath Karmakar NIL Private Consultancy Completed 2020-02-28 2020-07-01
66 Proof checking of the G+3 multi-storied building near Airport Dr. Somnath Karmakar NIL Private Consultancy Completed 2020-01-20 2020-07-14
67 Proof checking of 75 nos bridges under NFR Dr. Somnath Karmakar NIL Rail Consultancy Completed 2020-01-17 2021-04-10
68 Proof checking of the R.C. drain near railway station under ER Dr. Somnath Karmakar NIL Private Consultancy Completed 2019-11-26 2019-12-02
69 Safety checking of the drawing and design of NH-31 Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2019-09-16 2021-12-11
70 Proof checking of the structural design & drawing of RC drain cum pathway for a Smart City Dr. Somnath Karmakar NIL GoI @ Smart City Authority Consultancy Completed 2019-07-23 2019-07-26
71 Structural stability check by physical inspection at Chloride building Dr. Somnath Karmakar NIL Private Consultancy Completed 2019-06-03 2019-11-04
72 Proof checking of the structural design & drawing of plate girders & semi through bridges of ER Dr. Somnath Karmakar NIL Rail Consultancy Completed 2019-04-10 2019-11-07
73 Effect of Explosive Reactive Armour on Bridges under blast loading Dr. Somnath Karmakar NIL NIT Durgapur 500,000 Sponsored Completed 2019-04-04 2021-04-03
74 Site visit and its report for the structural stability at MES base camp Dr. Somnath Karmakar NIL MES Consultancy Completed 2019-03-01 2019-06-26
75 Site visit and report for structural failure at Shakambhari Ispat & Power Ltd Dr. Somnath Karmakar NIL Private Consultancy Completed 2019-03-01 2019-06-25
76 Proof checking of the design & drawing of different railway bridges under Indian Rail Dr. Somnath Karmakar NIL Rail Consultancy Completed 2019-02-01 2020-08-12
77 Proof checking of the structural design & drawing of hanger building under AAI Dr. Somnath Karmakar NIL AAI Consultancy Completed 2019-01-01 2019-04-10
78 Safety checking of NH-44 from Ch. 318.650 to 339.940 KM Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2018-11-26 2021-03-31
79 Proof checking of the structural design & drawing of 6 nos bridges at NH-37 Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2018-11-20 2019-07-12
80 Geotechnical report of BHEL power plant in the state of Tamil Nadu Dr. Somnath Karmakar NIL BHEL Consultancy Completed 2018-10-09 2019-07-05
81 Proof checking of the structural design & drawing of RC building of MES Dr. Somnath Karmakar NIL MES Consultancy Completed 2018-09-07 2019-06-27
82 Proof checking of the substructure of an industrial building of MES Dr. Somnath Karmakar Plus one MES Consultancy Completed 2018-08-27 2019-08-26
83 Proof checking of the design & drawing of a 50 m steel bridge at Sikkim Dr. Somnath Karmakar NIL GoI Consultancy Completed 2018-08-21 2018-08-29
84 Structural stability analysis of a shed for SPV project of Century ply Dr. Somnath Karmakar NIL Century Ply Consultancy Completed 2018-06-11 2018-06-22
85 Proof checking of the design & drawing of a small bridge Dr. Somnath Karmakar NIL IOCL Consultancy Completed 2018-06-11 2018-07-05
86 Proof checking of the design and drawing of three nos foot over bridges under KMDA Dr. Somnath Karmakar Plus one KMDA Consultancy Completed 2018-04-18 2018-06-04
87 Proof checking of the design and drawing of a boundary wall at WBSIDC LTD, Durgapur Dr. Somnath Karmakar Plus one GoWB Consultancy Completed 2018-04-16 2018-04-24
88 Proof checking of the design and drawing of thrust bed and box under of ER Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2018-04-12 2018-05-03
89 Proof checking of the design & drawing of NH-512 Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2018-02-02 2019-10-23
90 Proof checking of the design and drawing of a ROB under NH-82 Dr. Somnath Karmakar Plus one BSRDCL and NHIA Consultancy Completed 2017-12-29 2021-12-31
91 Proof checking of the design and drawing of NH-23 Dr. Somnath Karmakar Plus one NHAI Consultancy Completed 2017-12-04 2018-02-23
92 Site Visit & report of MBF & auxiliary unit at JBIL, Durgapur Dr. Somnath Karmakar Plus one Private Consultancy Completed 2017-11-30 2017-12-31
93 Proof checking of the design and drawing of 4 nos bridge substructures under NBDD Dr. Somnath Karmakar Plus one NBDA Consultancy Completed 2017-11-29 2017-12-20
94 Proof checking of the design and drawing of a Module Mounting Structure at Ferozepur and Kapurthala Dr. Somnath Karmakar Plus one Vikramsolar Pvt. Ltd. and NTPC Consultancy Completed 2017-11-25 2018-12-31
95 Proof checking of the design and drawing a minor bridges under NH-82 Dr. Somnath Karmakar Plus one BSRDCL and NHIA Consultancy Completed 2017-11-23 2018-03-12
96 Proof checking of the design and drawing of NH-125 Dr. Somnath Karmakar Plus one NHAI Consultancy Completed 2017-11-23 2021-12-31
97 Proof checking of the design and drawing for NH-78 Dr. Somnath Karmakar Plus one NHAI Consultancy Completed 2017-11-23 2021-12-31
98 Proof checking of the design and drawing of a bridge under W Medinipur Z.P. Dr. Somnath Karmakar Plus one GoWB Consultancy Completed 2017-06-15 2017-07-17
99 Proof checking of the design and drawing of steel truss for Car Service station at Andal Dr. Somnath Karmakar Plus one Private Consultancy Completed 2017-05-22 2017-06-25
100 Proof checking of the design and drawing of thrust bed and box under ECR Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2017-05-01 2019-04-30
101 Proof checking of the design and drawing of A/C side gable covering for Parking bay Dr. Somnath Karmakar Plus one Private Consultancy Completed 2017-04-21 2018-03-08
102 Seepage and strength analysis by NDT of RUBs under ER. Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2017-04-21 2018-07-18
103 Proof checking of the design and drawing a ROB oh NH-82 under BSRDCL and ECR Dr. Somnath Karmakar Plus one BSRDCL and NHIA Consultancy Completed 2017-02-15 2018-12-24
104 Proof checking of the design and drawing of the Major Bridge under NFR Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2017-01-31 2020-08-12
105 Proof checking of the drawing and design of a Bridge under W. Medinipur Z.P. Dr. Somnath Karmakar Plus one GoWB Consultancy Completed 2017-01-11 2017-07-17
106 Proof checking of the structural design and drawing of Krishna Bridge (64+5x120+64) m span Dr. Somnath Karmakar Plus one GoT Consultancy Completed 2017-01-04 2019-07-05
107 Proof checking of the design and drawing for light maintenance Hanger Dr. Somnath Karmakar Plus one Private Consultancy Completed 2016-11-16 2016-11-29
108 Proof checking of the design and drawing of Road ch. from 46.550 to 59.697 KM of NH-81 Dr. Somnath Karmakar Plus one NHAI Consultancy Completed 2016-11-15 2017-02-07
109 Site Visit to check the structural stability at Shyam sel & Power Ltd at Jamuria Dr. Somnath Karmakar Plus one Shyam Sel and Power Limited Consultancy Completed 2016-11-02 2016-11-12
110 Proof checking of the design and drawing of different ROB projects under ER Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2016-09-29 2019-02-25
111 Proof checking of the design and drawing of pile cap for a bridge over river Guddu at Chandrapura-Gomia Road Dr. Somnath Karmakar Plus one State Highway Authority of Jharkhand Consultancy Completed 2016-09-09 2016-10-09
112 Site Visit for structural stability at a private School, Durgapur Dr. Somnath Karmakar Plus one Private Consultancy Completed 2016-05-30 2016-06-03
113 Proof checking of the design and drawing of a PEB structure for NTPC Dr. Somnath Karmakar Plus one Vikramsolar Pvt. Ltd. and NTPC Consultancy Completed 2016-05-30 2016-08-02
114 Design of double storied PEB structure including foundation. Dr. Somnath Karmakar Plus one Private Consultancy Completed 2016-05-24 2016-06-15
115 Proof checking of the design and drawing 3 nos proposed ROB under ECR Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2016-05-02 2019-07-05
116 Proof checking of the design and drawing for widening & strengthening of NH-133 with 2 lanes with paved shoulder Dr. Somnath Karmakar Plus one NHAI Consultancy Completed 2016-05-02 2016-05-06
117 Proof checking of the bridge design and drawing over Koel River in Danda-Lalgarh road Dr. Somnath Karmakar Plus one State Highway Authority of Jharkhand Consultancy Completed 2016-04-05 2016-05-06
118 Proof checking of the design and drawing for the widening and strengthening of KTK road (from 0.00 KM to 82.055 Km) to 2 lanes with paved shoulder Dr. Somnath Karmakar Plus one State Highway Authority of Jharkhand Consultancy Completed 2016-03-17 2016-11-04
119 Proof checking of the design and drawing 12 nos. Minor Bridges, 11nos. Major Bridges & 12 nos. ROB under ECR Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2016-02-02 2019-07-05
120 Third Party Quality Control/Assurance for the construction of super-speciality block under PMSSY at B.S. Medical College, executed by CPWD Dr. Somnath Karmakar Plus one CPWD Consultancy Completed 2016-01-07 2019-08-20
121 Proof checking of the design and drawing of the Sub & Superstructure of AFS hanger Dr. Somnath Karmakar Plus one MES Consultancy Completed 2016-01-05 2016-01-16
122 Proof checking of the design and drawing for the construction of superspeciality block under PMSSY at B.S. Medical College Dr. Somnath Karmakar Plus one GoI Consultancy Completed 2016-01-05 2016-09-29
123 Proof checking of the design and drawing for the Substructure of guest house at Numaligarh Refinery Limited, IOCL Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2016-01-05 2016-01-29
124 Proof checking of the design and drawing for the strengthening and widening/reconstruction of 55 KM DMN Road to two lanes with paved shoulder Dr. Somnath Karmakar Plus one State Highway Authority of Jharkhand Consultancy Completed 2016-01-05 2016-02-08
125 Proof checking of design and drawing for Major & Minor Bridges structures at Manpur bye pass under ECR Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2015-12-14 2019-07-05
126 Site visit for Structural stability assessment of existing 40 flats at KIT scheme No. 118, of IOCL, Kolkata Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2015-08-25 2015-09-15
127 Site visit for Structural stability assessment of existing old canteen building of IOCL, HMRBPL-Mourigram HQ, Howrah. Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2015-08-20 2015-10-14
128 Proof checking for a Pre-Engineered building at Aizawl and Mizoram project Dr. Somnath Karmakar Plus one MES Consultancy Completed 2015-08-20 2015-09-02
129 Site visit for for the existing Civil Structure of IOCL, Pipelines Division, Durgapur Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2015-08-13 2015-08-21
130 Site Visit for an Auditorium at a private School, Durgapur Dr. Somnath Karmakar Plus one Private Consultancy Completed 2015-08-10 2015-09-02
131 Site Visit for an Auditorium at a private School, Durgapur Dr. Somnath Karmakar Plus one Private Consultancy Completed 2015-04-29 2015-04-30
132 Proof checking of the design and drawing for strengthening and Widening/Reconstruction of SH13 (JH), Length-69 Km, to two lanes with paved shoulder under EPC Mode Dr. Somnath Karmakar Plus one NHIA Consultancy Completed 2015-02-25 2016-04-05
133 Proof checking of the structural design and drawing of the 1000 Room (2000 seats) Boys Hostel Stilt +G+13 storied building at IIT Campus Dr. Somnath Karmakar Plus one CPWD Consultancy Completed 2015-02-24 2015-04-07
134 27). Third Party Quality Control/Assurance in various projects, executed by CPWD at IIT campus Dr. Somnath Karmakar Plus one CPWD Consultancy Completed 2015-02-24 2023-06-19
135 Proof checking of the B+G+9 storied research buildings, Auditorium and underground sump of IIT Dr. Somnath Karmakar Plus one CPWD/GoI Consultancy Completed 2015-02-20 2015-07-18
136 Consultancy on the raw material of Power Gird Dr. Somnath Karmakar Plus one Power Gird Consultancy Completed 2015-02-18 2015-03-31
137 Site visit at IOCL for stability checking of a part of structure Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2015-02-18 2015-02-20
138 Design and inspection of compound boundary wall for BPCL TOP Dr. Somnath Karmakar Plus one BPCL Consultancy Completed 2015-02-13 2015-05-28
139 Proof checking for the ROB design and drawing of BG line under Eastern Railways Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2015-02-12 2019-07-05
140 Proof checking of the design and drawing for Ammunition shelters Dr. Somnath Karmakar Plus one Private Consultancy Completed 2015-02-03 2015-02-20
141 Mix design of M30 grade of concrete Dr. Somnath Karmakar Plus one CPWD Consultancy Completed 2014-12-18 2015-02-17
142 Pavement Investigation of NH-44 from Udaipur to Sabroom Dr. Somnath Karmakar Plus one NHAI Consultancy Completed 2014-12-09 2015-03-23
143 Design of a structural part for the Auditorium of a private school in Durgapur Dr. Somnath Karmakar Plus one Private Consultancy Completed 2014-12-09 2014-12-22
144 Site Visit for Auditorium at a private School in Durgapur Dr. Somnath Karmakar Plus one Private Consultancy Completed 2014-11-12 2014-11-26
145 Mix design M25 and M30 grades of concrete Dr. Somnath Karmakar Plus one Private Consultancy Completed 2014-11-03 2015-01-08
146 Proof checking of G+6 storied apartment building at Durgapur Dr. Somnath Karmakar Plus one Private Consultancy Completed 2014-09-23 2014-09-30
147 Proof checking of 31 nos. minor bridge under EC Railways, Mahendrughat Dr. Somnath Karmakar Plus One Rail Consultancy Completed 2014-09-09 2019-07-05
148 Proof checking of the structural drawings & designs of ITI Buildings under GoWB Dr. Somnath Karmakar Plus one GoWB Consultancy Completed 2014-08-26 2014-09-09
149 Site Visit for detailed investigation of the reason of downfall of East side compound wall of BPCL Dr. Somnath Karmakar Plus one BPCL Consultancy Completed 2014-08-26 2014-08-29
150 Proof checking of the substructure & Superstructure of AFS hanger at North-East Dr. Somnath Karmakar Plus one MES Consultancy Completed 2014-06-27 2014-07-18
151 Proof checking of the pile structure system of AFS hanger Dr. Somnath Karmakar Plus one MES Consultancy Completed 2014-05-22 2014-05-29
152 Proof checking of the substructure & Superstructure AFS hanger Dr. Somnath Karmakar Plus one MES Consultancy Completed 2014-02-24 2022-03-04
153 Proof checking of the substructure & Superstructure of AFS hanger Dr. Somnath Karmakar Plus one MES Consultancy Completed 2014-02-24 2014-03-24
154 Proof checking of the structural design and drawing of flood light towers at LPG bottling plant Durgapur Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2014-01-21 2014-03-28
155 Proof checking of the foundation design for LPG pump at Durgapur Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2014-01-21 2014-03-28
156 Proof checking of the Air Port craft shed-1 Dr. Somnath Karmakar Plus one MES Consultancy Completed 2013-12-19 2014-02-24
157 1). Structural design to raise the height of boundary wall at LPG bottling plant at Durgapur Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2013-03-06 2013-07-10

Projects

Sl.No. Title Name of the PI Name of the CoPIs Funding Agency Amount (Rs.) Project Type Project Status Date of Initiation Date of Completion
1 Effect of Explosive Reactive Armour on Bridges under blast loading Dr. Somnath Karmakar NIL NIT Durgapur 500,000 Sponsored Completed 2019-04-04 2021-04-03

Projects

Sl.No. Title Name of the PI Name of the CoPIs Funding Agency Amount (Rs.) Project Type Project Status Date of Initiation Date of Completion
1 154). Proof checking of 2 nos bridges under S. E. R. between Narayangarh and Bhadrak Section without site visits Dr. Somnath Karmakar NIL Private Consultancy Ongoing 2024-12-05
2 156). Proof checking of 11 nos bridges under ECR between Madhubani to Sagauli Section without site visits Dr. Somnath Karmakar NIL Rail Consultancy Ongoing 2024-11-26
3 155). Safety checking RCC bridge, approach road, Guide bund and protection works without site visits Dr. Somnath Karmakar NIL Private Consultancy Ongoing 2024-11-20
4 153). Proof checking of the mix designs of M15, 20, 25, 30 & 35 Dr. Somnath Karmakar NIL Private Consultancy Ongoing 2024-09-19
5 151). Proof checking of the structural design and drawings for the construction of 91.0 m span steel truss bridge under GTA_WBSRDA Kalimpong, with site visits Dr. Somnath Karmakar NIL Private Consultancy Ongoing 2024-08-29 2024-12-18
6 150). Proof checking of the construction of 4 lane ROB and its approach road at Ekangarsarai at NH33 Dr. Somnath Karmakar NIL Private Consultancy Ongoing 2024-08-29 2024-10-29
7 147). Proof checking of the structural design and drawings of a Road and Bridge near Upper Cart Road under GTA_WBSRDA Kalimpong Dr. Somnath Karmakar NIL GOI Consultancy Ongoing 2024-07-22 2024-11-07
8 148). Proof checking of design and drawings for Form-work of ORP at AF STN CHABUA under MES Dr. Somnath Karmakar NIL MES Consultancy Ongoing 2024-07-22 2024-08-28
9 145). Proof checking of design and drawings of the Stripping Shed for Loco shop Wagon at Jamalpur Railway workshop Dr. Somnath Karmakar NIL Rail Consultancy Ongoing 2024-06-27 2024-07-03
10 149). Proof checking of design and drawings of 20 nos. bridges in Samastipur Division under EC Indian Railway Dr. Somnath Karmakar NIL Rail Consultancy Ongoing 2024-06-27
11 152). Safety checking of 9 nos Over Head Reservoir at various places of Murshidabad district under P. H. Engineering Department, Govt of WB Dr. Somnath Karmakar NIL GoWB Consultancy Ongoing 2024-06-22
12 146). Proof checking of design and drawings of G+6 residential building and earth retaining structure of Oil India houshing at, Gwuahati Dr. Somnath Karmakar NIL MES Consultancy Completed 2024-06-12 2024-08-30
13 144). Proof checking of design and drawings of 500 dia MS water pipe line support and girder over subway spans 10 m and 18 m at Kharagpur Dr. Somnath Karmakar NIL Private Consultancy Ongoing 2024-05-02 2024-05-09
14 143). Proof checking of design and drawings of various structures of ROB in lieu of level crossing no 47c in under Malda division Dr. Somnath Karmakar NIL Rail Consultancy Ongoing 2024-05-02 2024-05-24
15 141). Proof checking of structural design and drawing 3 nos bridges, one no foothpath and trolly refuge and one embankment under IR Dr. Somnath Karmakar NIL Rail Consultancy Ongoing 2024-02-19 2024-03-02
16 142). Slope stability analysis of the earthen slope from land sliding at Gangtak under MES Dr. Somnath Karmakar Plus Two MES Consultancy Ongoing 2024-02-19 2024-04-04
17 140). Proof checking of structural design and drawing of substructures and foundations for 5 nos bridges under IR Dr. Somnath Karmakar NIL Rail Consultancy Ongoing 2024-02-13 2024-03-21
18 139). Safety checking of the ROB of bow-string girder of 64.60 m span under NH81 Dr. Somnath Karmakar NIL GDCL Consultancy Ongoing 2023-12-20 2024-01-09
19 Proof checking of the G+7 building proven of deficient married ACCN at Bangalore, Dr. Somnath Karmakar NIL Air Force Consultancy Ongoing 2023-09-19 2023-09-29
20 Proof checking of the sructural design and drawing of Industrial building at Indore Dr. Somnath Karmakar Two Private Consultancy Ongoing 2023-09-15 2023-10-12
21 Proof checking of a commertial building (G + 0) at Tezpur Dr. Somnath Karmakar NIL Private Consultancy Ongoing 2023-08-07 2023-08-12
22 Raft foundation and retaining wall for Igloo structure, Kathihar @ MES Dr. Somnath Karmakar NIL Private Consultancy Completed 2023-07-10 2023-07-12
23 Proof checking of structural design and drawing of different ROB of Dhanbad under ECR Dr. Somnath Karmakar NIL Rail Consultancy Completed 2023-06-20 2023-06-27
24 Erection and launching scheme of 60 m span for proposed ROB no. 382 at 137/24-27 KM, and 30.5 m span for proposed ROR no. 30B Dr. Somnath Karmakar NIL Private Consultancy Completed 2023-06-12 2023-06-16
25 Design and drawing of the protective wall basket under Indian Army Dr. Somnath Karmakar NIL MES Consultancy Completed 2023-06-05 2023-06-07
26 Site visit and report development for an all-weather usable condition certificate cum Building Safety Certificate for a Private School at Durgapur Dr. Somnath Karmakar NIL Private Consultancy Completed 2023-05-23 2023-05-25
27 Proof checking of the G+3 buildings and site visit for safety audit of the same of a college, Durgapur Dr. Somnath Karmakar NIL Private Consultancy Completed 2023-04-17 2023-07-31
28 Physical site visit to check the old RC overhead water tank at Satitara and Gokarna under WB PHE Department Dr. Somnath Karmakar NIL GoWB Consultancy Completed 2023-04-17 2023-05-15
29 Design and safety of special 'OHE' supporting portal structure of 48m span suitable for holding load of 15 nos. OHE Dr. Somnath Karmakar NIL Rail Consultancy Completed 2023-04-13 2023-05-04
30 Proof checking of the structural design & drawing of buildings under the NEC of India Dr. Somnath Karmakar NIL NEC @ GoI Consultancy Completed 2023-03-16 2023-06-16
31 Proof checking of erection & launching scheme of 30.5 m RDSO standard steel superstructure under KGP Division Dr. Somnath Karmakar NIL Rail Consultancy Completed 2023-03-15 2023-03-19
32 Proof checking of Structural drawing and design for its stability of a relocatable Fast Erecting Modular Shelter Dr. Somnath Karmakar NIL GoI Consultancy Completed 2023-03-10 2023-05-18
33 Physical site visit to an RC overhead water tank at Berhampur Dr. Somnath Karmakar NIL GoWB Consultancy Completed 2023-01-31 2023-06-23
34 Safety checking of one flyover and one major bridge on NH-730 under GoUP PWD Dr. Somnath Karmakar NIL GoUP Consultancy Completed 2023-01-18 2023-06-11
35 Proof checking of the erection & launching scheme of 30 and 24 m for ROB over SH 5, WB Dr. Somnath Karmakar NIL Private Consultancy Completed 2022-12-28 2023-01-11
36 Consultancy on the mix design of M30 grade of concrete for special use Dr. Somnath Karmakar NIL Private Consultancy Completed 2022-11-29 2023-01-25
37 Proof checking of a 30 m span steel bridge superstructure in Sikkam, GoS Dr. Somnath Karmakar NIL GoSK Consultancy Completed 2022-11-18 2022-12-01
38 Safety audit of an old brick masonry Govt building at Asansol Dr. Somnath Karmakar NIL GoWB Consultancy Completed 2022-11-05 2022-11-15
39 Substructure of a ROB over LC Gate No. CA26 under NFR Dr. Somnath Karmakar NIL Rail Consultancy Completed 2022-09-26 2023-05-04
40 Road safety audit of NH-31 from 00.00 KM to 27.50 KM Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2022-08-01 2023-01-12
41 Proof checking of the design and drawing of the 4 - lane ROB and its Approaches at KM 41.760 of NH-2B in the State of west Bengal and Proof checking of erection scheme of railway girders Dr. Somnath Karmakar NIL Rail Consultancy Completed 2022-04-26 2024-02-04
42 Proof checking of construction of 04xLRC IGLOO storage ACCN for the Military station Dr. Somnath Karmakar NIL MES Consultancy Completed 2022-04-25 2022-04-29
43 Proof checking of bridge design and drawing for Intake well over river Ajay Dr. Somnath Karmakar NIL Shyam Sel and Power Limited Consultancy Completed 2022-04-04 2022-05-27
44 Proof checking of the G + 2 type officers quarter in LGSF technology of IOCL Dr. Somnath Karmakar NIL IOCL Consultancy Completed 2022-04-04 2022-04-09
45 Proof checking of 20 m span steel bridge superstructure along Chuba Khola at Sikkam Dr. Somnath Karmakar NIL Private Consultancy Completed 2022-03-29 2022-04-06
46 Proof checking of the pile Integrity test at Rajarhat-Newtown campus under Housing board, WB Dr. Somnath Karmakar NIL GoWB Consultancy Completed 2022-03-23 2022-02-17
47 Mix design of M30 grade of concrete Dr. Somnath Karmakar NIL Private Consultancy Completed 2022-01-24 2022-02-12
48 Proof checking of the Erection & launching scheme of 36 m bow string girder between Kharagpur to Hijli for 3Rd line Dr. Somnath Karmakar NIL Rail Consultancy Completed 2021-11-02 2021-11-29
49 Safety checking of Kendriya Vidyalaya Asansol Dr. Somnath Karmakar NIL Kendriya Vidyalaya Consultancy Completed 2021-08-05 2021-08-27
50 Proof checking of the design of a new shed near test shed at CLW, E.R. Dr. Somnath Karmakar NIL CLW Consultancy Completed 2021-06-25 2021-07-17
51 Proof checking of ROB of NH-82 under BSRDCL Dr. Somnath Karmakar NIL BSRDCL and NHIA Consultancy Completed 2021-06-18 2021-10-01
52 Proof checking of G+1 building at central University Jharkhand Dr. Somnath Karmakar NIL GoI Consultancy Completed 2021-04-23 2021-06-11
53 Proof checking of 2 nos bridges over NH-31C Dr. Somnath Karmakar NIL NHIA Consultancy Completed 2021-04-23 2021-07-05
54 Proof checking of a steel structural shed of 2400 sqm Dr. Somnath Karmakar NIL Private Consultancy Completed 2021-04-07 2021-04-21
55 Erection & launching scheme of 32.5 m composite girder of ROB on KGP-Tata Section Dr. Somnath Karmakar NIL Rail Consultancy Completed 2021-03-10 2021-03-12
56 Proof checking of the design and drawing of NH 44A from Ch. 0.000 to 16.290 km Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2021-01-27 2021-07-15
57 Proof checking of the design and drawing of 45 nos bridges’ substructures and foundation under SE Railway Dr. Somnath Karmakar NIL Rail Consultancy Completed 2021-01-01 2022-04-07
58 Proof checking of the design and drawing of the Bow-String substructure and foundation of ROB of NH-82 Dr. Somnath Karmakar NIL BSRDCL and NHIA Consultancy Completed 2020-12-17 2021-10-01
59 Proof checking of the design and drawing of the superstructure at NH-33 Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2020-11-13 2020-12-10
60 Proof checking of the design and drawing for retrofitting and redevelopment of smart city network Dr. Somnath Karmakar NIL GoI @ Smart City Authority Consultancy Completed 2020-10-15 2021-06-28
61 Proof checking of the design and drawing of 2 nos superstructure & Pier Cap of Major Bridge at NH-33 Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2020-08-17 2021-02-20
62 Proof checking of the design and drawing of 2 lanes roads for widening and improvement of NH-75 Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2020-07-22 2020-08-17
63 Proof checking of the design and drawing of the structural shed of Hindustan Aeronautics Limited (HAL) Dr. Somnath Karmakar NIL HAL Consultancy Completed 2020-07-01 2020-07-30
64 Mix design of M25 & M35 grade of concrete Dr. Somnath Karmakar NIL Private Consultancy Completed 2020-02-28 2020-06-05
65 Consultancy on cracks checking for G + 4 storied residential building by NDT checks Dr. Somnath Karmakar NIL Private Consultancy Completed 2020-02-28 2020-07-01
66 Proof checking of the G+3 multi-storied building near Airport Dr. Somnath Karmakar NIL Private Consultancy Completed 2020-01-20 2020-07-14
67 Proof checking of 75 nos bridges under NFR Dr. Somnath Karmakar NIL Rail Consultancy Completed 2020-01-17 2021-04-10
68 Proof checking of the R.C. drain near railway station under ER Dr. Somnath Karmakar NIL Private Consultancy Completed 2019-11-26 2019-12-02
69 Safety checking of the drawing and design of NH-31 Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2019-09-16 2021-12-11
70 Proof checking of the structural design & drawing of RC drain cum pathway for a Smart City Dr. Somnath Karmakar NIL GoI @ Smart City Authority Consultancy Completed 2019-07-23 2019-07-26
71 Structural stability check by physical inspection at Chloride building Dr. Somnath Karmakar NIL Private Consultancy Completed 2019-06-03 2019-11-04
72 Proof checking of the structural design & drawing of plate girders & semi through bridges of ER Dr. Somnath Karmakar NIL Rail Consultancy Completed 2019-04-10 2019-11-07
73 Site visit and report for structural failure at Shakambhari Ispat & Power Ltd Dr. Somnath Karmakar NIL Private Consultancy Completed 2019-03-01 2019-06-25
74 Site visit and its report for the structural stability at MES base camp Dr. Somnath Karmakar NIL MES Consultancy Completed 2019-03-01 2019-06-26
75 Proof checking of the design & drawing of different railway bridges under Indian Rail Dr. Somnath Karmakar NIL Rail Consultancy Completed 2019-02-01 2020-08-12
76 Proof checking of the structural design & drawing of hanger building under AAI Dr. Somnath Karmakar NIL AAI Consultancy Completed 2019-01-01 2019-04-10
77 Safety checking of NH-44 from Ch. 318.650 to 339.940 KM Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2018-11-26 2021-03-31
78 Proof checking of the structural design & drawing of 6 nos bridges at NH-37 Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2018-11-20 2019-07-12
79 Geotechnical report of BHEL power plant in the state of Tamil Nadu Dr. Somnath Karmakar NIL BHEL Consultancy Completed 2018-10-09 2019-07-05
80 Proof checking of the structural design & drawing of RC building of MES Dr. Somnath Karmakar NIL MES Consultancy Completed 2018-09-07 2019-06-27
81 Proof checking of the substructure of an industrial building of MES Dr. Somnath Karmakar Plus one MES Consultancy Completed 2018-08-27 2019-08-26
82 Proof checking of the design & drawing of a 50 m steel bridge at Sikkim Dr. Somnath Karmakar NIL GoI Consultancy Completed 2018-08-21 2018-08-29
83 Structural stability analysis of a shed for SPV project of Century ply Dr. Somnath Karmakar NIL Century Ply Consultancy Completed 2018-06-11 2018-06-22
84 Proof checking of the design & drawing of a small bridge Dr. Somnath Karmakar NIL IOCL Consultancy Completed 2018-06-11 2018-07-05
85 Proof checking of the design and drawing of three nos foot over bridges under KMDA Dr. Somnath Karmakar Plus one KMDA Consultancy Completed 2018-04-18 2018-06-04
86 Proof checking of the design and drawing of a boundary wall at WBSIDC LTD, Durgapur Dr. Somnath Karmakar Plus one GoWB Consultancy Completed 2018-04-16 2018-04-24
87 Proof checking of the design and drawing of thrust bed and box under of ER Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2018-04-12 2018-05-03
88 Proof checking of the design & drawing of NH-512 Dr. Somnath Karmakar NIL NHAI Consultancy Completed 2018-02-02 2019-10-23
89 Proof checking of the design and drawing of a ROB under NH-82 Dr. Somnath Karmakar Plus one BSRDCL and NHIA Consultancy Completed 2017-12-29 2021-12-31
90 Proof checking of the design and drawing of NH-23 Dr. Somnath Karmakar Plus one NHAI Consultancy Completed 2017-12-04 2018-02-23
91 Site Visit & report of MBF & auxiliary unit at JBIL, Durgapur Dr. Somnath Karmakar Plus one Private Consultancy Completed 2017-11-30 2017-12-31
92 Proof checking of the design and drawing of 4 nos bridge substructures under NBDD Dr. Somnath Karmakar Plus one NBDA Consultancy Completed 2017-11-29 2017-12-20
93 Proof checking of the design and drawing of a Module Mounting Structure at Ferozepur and Kapurthala Dr. Somnath Karmakar Plus one Vikramsolar Pvt. Ltd. and NTPC Consultancy Completed 2017-11-25 2018-12-31
94 Proof checking of the design and drawing for NH-78 Dr. Somnath Karmakar Plus one NHAI Consultancy Completed 2017-11-23 2021-12-31
95 Proof checking of the design and drawing of NH-125 Dr. Somnath Karmakar Plus one NHAI Consultancy Completed 2017-11-23 2021-12-31
96 Proof checking of the design and drawing a minor bridges under NH-82 Dr. Somnath Karmakar Plus one BSRDCL and NHIA Consultancy Completed 2017-11-23 2018-03-12
97 Proof checking of the design and drawing of a bridge under W Medinipur Z.P. Dr. Somnath Karmakar Plus one GoWB Consultancy Completed 2017-06-15 2017-07-17
98 Proof checking of the design and drawing of steel truss for Car Service station at Andal Dr. Somnath Karmakar Plus one Private Consultancy Completed 2017-05-22 2017-06-25
99 Proof checking of the design and drawing of thrust bed and box under ECR Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2017-05-01 2019-04-30
100 Seepage and strength analysis by NDT of RUBs under ER. Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2017-04-21 2018-07-18
101 Proof checking of the design and drawing of A/C side gable covering for Parking bay Dr. Somnath Karmakar Plus one Private Consultancy Completed 2017-04-21 2018-03-08
102 Proof checking of the design and drawing a ROB oh NH-82 under BSRDCL and ECR Dr. Somnath Karmakar Plus one BSRDCL and NHIA Consultancy Completed 2017-02-15 2018-12-24
103 Proof checking of the design and drawing of the Major Bridge under NFR Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2017-01-31 2020-08-12
104 Proof checking of the drawing and design of a Bridge under W. Medinipur Z.P. Dr. Somnath Karmakar Plus one GoWB Consultancy Completed 2017-01-11 2017-07-17
105 Proof checking of the structural design and drawing of Krishna Bridge (64+5x120+64) m span Dr. Somnath Karmakar Plus one GoT Consultancy Completed 2017-01-04 2019-07-05
106 Proof checking of the design and drawing for light maintenance Hanger Dr. Somnath Karmakar Plus one Private Consultancy Completed 2016-11-16 2016-11-29
107 Proof checking of the design and drawing of Road ch. from 46.550 to 59.697 KM of NH-81 Dr. Somnath Karmakar Plus one NHAI Consultancy Completed 2016-11-15 2017-02-07
108 Site Visit to check the structural stability at Shyam sel & Power Ltd at Jamuria Dr. Somnath Karmakar Plus one Shyam Sel and Power Limited Consultancy Completed 2016-11-02 2016-11-12
109 Proof checking of the design and drawing of different ROB projects under ER Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2016-09-29 2019-02-25
110 Proof checking of the design and drawing of pile cap for a bridge over river Guddu at Chandrapura-Gomia Road Dr. Somnath Karmakar Plus one State Highway Authority of Jharkhand Consultancy Completed 2016-09-09 2016-10-09
111 Proof checking of the design and drawing of a PEB structure for NTPC Dr. Somnath Karmakar Plus one Vikramsolar Pvt. Ltd. and NTPC Consultancy Completed 2016-05-30 2016-08-02
112 Site Visit for structural stability at a private School, Durgapur Dr. Somnath Karmakar Plus one Private Consultancy Completed 2016-05-30 2016-06-03
113 Design of double storied PEB structure including foundation. Dr. Somnath Karmakar Plus one Private Consultancy Completed 2016-05-24 2016-06-15
114 Proof checking of the design and drawing 3 nos proposed ROB under ECR Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2016-05-02 2019-07-05
115 Proof checking of the design and drawing for widening & strengthening of NH-133 with 2 lanes with paved shoulder Dr. Somnath Karmakar Plus one NHAI Consultancy Completed 2016-05-02 2016-05-06
116 Proof checking of the bridge design and drawing over Koel River in Danda-Lalgarh road Dr. Somnath Karmakar Plus one State Highway Authority of Jharkhand Consultancy Completed 2016-04-05 2016-05-06
117 Proof checking of the design and drawing for the widening and strengthening of KTK road (from 0.00 KM to 82.055 Km) to 2 lanes with paved shoulder Dr. Somnath Karmakar Plus one State Highway Authority of Jharkhand Consultancy Completed 2016-03-17 2016-11-04
118 Proof checking of the design and drawing 12 nos. Minor Bridges, 11nos. Major Bridges & 12 nos. ROB under ECR Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2016-02-02 2019-07-05
119 Third Party Quality Control/Assurance for the construction of super-speciality block under PMSSY at B.S. Medical College, executed by CPWD Dr. Somnath Karmakar Plus one CPWD Consultancy Completed 2016-01-07 2019-08-20
120 Proof checking of the design and drawing of the Sub & Superstructure of AFS hanger Dr. Somnath Karmakar Plus one MES Consultancy Completed 2016-01-05 2016-01-16
121 Proof checking of the design and drawing for the Substructure of guest house at Numaligarh Refinery Limited, IOCL Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2016-01-05 2016-01-29
122 Proof checking of the design and drawing for the strengthening and widening/reconstruction of 55 KM DMN Road to two lanes with paved shoulder Dr. Somnath Karmakar Plus one State Highway Authority of Jharkhand Consultancy Completed 2016-01-05 2016-02-08
123 Proof checking of the design and drawing for the construction of superspeciality block under PMSSY at B.S. Medical College Dr. Somnath Karmakar Plus one GoI Consultancy Completed 2016-01-05 2016-09-29
124 Proof checking of design and drawing for Major & Minor Bridges structures at Manpur bye pass under ECR Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2015-12-14 2019-07-05
125 Site visit for Structural stability assessment of existing 40 flats at KIT scheme No. 118, of IOCL, Kolkata Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2015-08-25 2015-09-15
126 Site visit for Structural stability assessment of existing old canteen building of IOCL, HMRBPL-Mourigram HQ, Howrah. Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2015-08-20 2015-10-14
127 Proof checking for a Pre-Engineered building at Aizawl and Mizoram project Dr. Somnath Karmakar Plus one MES Consultancy Completed 2015-08-20 2015-09-02
128 Site visit for for the existing Civil Structure of IOCL, Pipelines Division, Durgapur Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2015-08-13 2015-08-21
129 Site Visit for an Auditorium at a private School, Durgapur Dr. Somnath Karmakar Plus one Private Consultancy Completed 2015-08-10 2015-09-02
130 Site Visit for an Auditorium at a private School, Durgapur Dr. Somnath Karmakar Plus one Private Consultancy Completed 2015-04-29 2015-04-30
131 Proof checking of the design and drawing for strengthening and Widening/Reconstruction of SH13 (JH), Length-69 Km, to two lanes with paved shoulder under EPC Mode Dr. Somnath Karmakar Plus one NHIA Consultancy Completed 2015-02-25 2016-04-05
132 27). Third Party Quality Control/Assurance in various projects, executed by CPWD at IIT campus Dr. Somnath Karmakar Plus one CPWD Consultancy Completed 2015-02-24 2023-06-19
133 Proof checking of the structural design and drawing of the 1000 Room (2000 seats) Boys Hostel Stilt +G+13 storied building at IIT Campus Dr. Somnath Karmakar Plus one CPWD Consultancy Completed 2015-02-24 2015-04-07
134 Proof checking of the B+G+9 storied research buildings, Auditorium and underground sump of IIT Dr. Somnath Karmakar Plus one CPWD/GoI Consultancy Completed 2015-02-20 2015-07-18
135 Consultancy on the raw material of Power Gird Dr. Somnath Karmakar Plus one Power Gird Consultancy Completed 2015-02-18 2015-03-31
136 Site visit at IOCL for stability checking of a part of structure Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2015-02-18 2015-02-20
137 Design and inspection of compound boundary wall for BPCL TOP Dr. Somnath Karmakar Plus one BPCL Consultancy Completed 2015-02-13 2015-05-28
138 Proof checking for the ROB design and drawing of BG line under Eastern Railways Dr. Somnath Karmakar Plus one Rail Consultancy Completed 2015-02-12 2019-07-05
139 Proof checking of the design and drawing for Ammunition shelters Dr. Somnath Karmakar Plus one Private Consultancy Completed 2015-02-03 2015-02-20
140 Mix design of M30 grade of concrete Dr. Somnath Karmakar Plus one CPWD Consultancy Completed 2014-12-18 2015-02-17
141 Pavement Investigation of NH-44 from Udaipur to Sabroom Dr. Somnath Karmakar Plus one NHAI Consultancy Completed 2014-12-09 2015-03-23
142 Design of a structural part for the Auditorium of a private school in Durgapur Dr. Somnath Karmakar Plus one Private Consultancy Completed 2014-12-09 2014-12-22
143 Site Visit for Auditorium at a private School in Durgapur Dr. Somnath Karmakar Plus one Private Consultancy Completed 2014-11-12 2014-11-26
144 Mix design M25 and M30 grades of concrete Dr. Somnath Karmakar Plus one Private Consultancy Completed 2014-11-03 2015-01-08
145 Proof checking of G+6 storied apartment building at Durgapur Dr. Somnath Karmakar Plus one Private Consultancy Completed 2014-09-23 2014-09-30
146 Proof checking of 31 nos. minor bridge under EC Railways, Mahendrughat Dr. Somnath Karmakar Plus One Rail Consultancy Completed 2014-09-09 2019-07-05
147 Proof checking of the structural drawings & designs of ITI Buildings under GoWB Dr. Somnath Karmakar Plus one GoWB Consultancy Completed 2014-08-26 2014-09-09
148 Site Visit for detailed investigation of the reason of downfall of East side compound wall of BPCL Dr. Somnath Karmakar Plus one BPCL Consultancy Completed 2014-08-26 2014-08-29
149 Proof checking of the substructure & Superstructure of AFS hanger at North-East Dr. Somnath Karmakar Plus one MES Consultancy Completed 2014-06-27 2014-07-18
150 Proof checking of the pile structure system of AFS hanger Dr. Somnath Karmakar Plus one MES Consultancy Completed 2014-05-22 2014-05-29
151 Proof checking of the substructure & Superstructure AFS hanger Dr. Somnath Karmakar Plus one MES Consultancy Completed 2014-02-24 2022-03-04
152 Proof checking of the substructure & Superstructure of AFS hanger Dr. Somnath Karmakar Plus one MES Consultancy Completed 2014-02-24 2014-03-24
153 Proof checking of the structural design and drawing of flood light towers at LPG bottling plant Durgapur Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2014-01-21 2014-03-28
154 Proof checking of the foundation design for LPG pump at Durgapur Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2014-01-21 2014-03-28
155 Proof checking of the Air Port craft shed-1 Dr. Somnath Karmakar Plus one MES Consultancy Completed 2013-12-19 2014-02-24
156 1). Structural design to raise the height of boundary wall at LPG bottling plant at Durgapur Dr. Somnath Karmakar Plus one IOCL Consultancy Completed 2013-03-06 2013-07-10
Indexing

6

Google Scholar h-index

4

Google Scholar i10-index

4

Scopus h-index
Awards and Recognitions

iv). Member of West Bengal State Technical Agency (WBSTA) for facilitating the scrutiny of project proposals under the Pradhan Mantri Gram Sadak Yojana (PMGSY): Ministry of Rural Development, Government of India.

iii). Indian Roads Congress, LM (42090)

ii). GATE-2005: All India Rank 910 &  Percentile Score 89.76

i). Scholarship & Stipend holder @ Secondary Examination, 1995

Administrative Responsibilities

S

N

Section/office/ Institute level committee

From

To

Position

held

Responsibilities

 

  15. Institute      13.11.2024    Nodal Faculty Member

Bureau of Indian Standard,

Govt of India

14.

Institute

25.02.2020

23.02.2024

Member (Civil)

Construction and PMQCC

13.

Institute

09.04.2018

One time

Member

Convener

Reconstruction of the missing files of U.G. Tank

12.

Maintenance Section

13.03.2018

31.10.2021

Faculty In-Charge

 Maintenance Section (Civil)

11.

Establishment section

18.12.2017

21.09.2022

Member

Post Based Reservation Rouster for staff

10.

Establishment section

21.09.2017

01.11.2023

Chairman

Chairman of purchase committee: Director Bungalow, guest House, Establishment section

09.

Medical Unit

30.08.2017

One time

Member

Tender Cum Local Purchase Committee

08.

Maintenance Section

12.01.2016

12.03.2018

Technical Advisor 

 Maintenance Section (Civil)

07.

Institute

18.09.2014

23.03.2015

Member

Internal Finance Committee

06.

Academic Section

05.09.2014

04.09.2017

Faculty In-Charge

Academic and Examinations

05.

Institute

22.01.2014

21.01.2016

Member

B.O.G.

04.

Institute

26.02.2013

One time

Member

Central Purchase Committee

03.

Academic Section

05.09.2012

04.09.2014

Professor In-Charge Examinations

Academic and Examinations

02.

Physical Training Department

02.07.2012

One time

Technical Expert

 Sports development works at different halls

01.

Institute

04.11.2011

One time

Member

Escalation Committee of Capacity Expansion of Hostel No. 1, 2 & 5. 

 

Contact

Off line:

Room No. CE03, Department of Civil Engineering, NIT Durgapur, India-713209

Online:

Mobile : +91-9434788155(O), +919434375887 (P) & +91-3432754187 (O)
Email : skarmakar.ce@nitdgp.ac.in, structure.som07@gmail.com

ORCID:

https://orcid.org/0000-0001-7622-9555

Miscellanous

Continuing Educations

03). Safe and Sustainable Road Construction and Current Trends (SSRCCT -2024) on 01.04.2024 to 06. 01.2024)

02). Enhancing Pedagogy Skills on 16.03.2009 to 20.03.2009

01). Enhancing Pedagogy Skills on 23.02.2009 to 27.02.2009  

Outreach Activity   

 

12). Reviewer to Environmental Engineering and Management Journal (Gheorghe Asachi” Technical University of Iași, Romania)

11). Reviewer to Computers and Structures (Elsevier Ltd)

10). Reviewer to Buildings (MDPI)

09). Reviewer to International Journal of Environmental Research and Public Health (MDPI)

08). Reviewer to Journal of Asian Architecture and Building Engineering (Taylor & Francis)

07). Reviewer to Structural Engineering and Mechanics, An International Journal (Techno-Press)

06). Reviewer to Journal of Infrastructure Systems (ASCE)

05). Reviewer to 13th Structural Engineering Convention (VNIT Nagpur)

04). Reviewer to Wind and Structures, An International Journal (Techno-Press)

03). Reviewer to Journal of Vibration and Control (SAGE)

02). Reviewer to Indian Concrete Journal (ACC)

01). Reviewer to Journal of the Institute Engineers (India): Series A  (Springer) 

 

DSC Members

01). Saikat Suvra Mondal @ , 02). Sudipta Ghosh @ 19CE1103, 03). Soumya Mukherjee @ 19CE1104, 04). Sukamal Kanta Ghosh @ 21CE1105, 05). Suktiprajna Rath @ 22CE1104, 06). Shreyasee S Sanjay @ 22CE1105, 07). Sourav Sarkhel @ 23CE1102, 08). Arindam Prasad Sinha @ 23CE1103, 09). Sourav Dutta @ 23CE1104 

M.Tech Project (Structural Engineering) Students

01). Kanchan Sengupta @ 09CE410, 02). Needhi Kotoky @ 10CE402, 03). Piyali Basu @ 11CE408, 04). Asim Mukherjee @ 12CE401, 05). Subashini Rajaram @ 12CE407, 06). Goutam Kuti @ 13CE402, 07). Subhash Chandra Bhusan @ 13CE410, 08). Dasari Sudheer Kumar @ 14CE402, 09). Pallavi Rai @ 14CE416, 10). Rajnesh Kumar @ 14CE467, 11). Aakash Rawal @ 15CE408, 12). Indrani Chattopadhyay @ 15CE413, 13). Sumit Bordhan @ 16CE4104, 14). Rupak Mazumdar @ 16CE4117, 15). Anusua Sen @ 17CE4101, 16). Pritha Roy @ 17CE4115, 17). Raju Sarkar @ 18CE4110, 18). Chilipili Adithya @ 18CE4111, 19). Prithwish Kundu @ 19CE41109, 20). Umesh Gupta @ 20CE4105, 21). Goutam Kumar @ 20CE4116, 22). Samir Kumar @ 21CE4103, 23). Soumyajit Ghosh @ 22CE4105, 24). Subhashish Prasad @ 22CE4114, 25). Satyamjit Vishwakarma @ 23CE4104, 26). Arun Kumar @ 23CE4114

B.Tech Project Students

01). Anjan Majee @ 06CE21, 02). Mrinal Kanti Dutta @ 06CE23, 03). Anirban Mondal @ 07CE09, 04). Rishi Nalamwar @ 07CE33, 05). Arindam Dhar @ 08CE46, 06). Mandakini Chowdhury @ 08CE47, 07). Mithil Mazumder @ 08CE48, 08). Dhriti Kundu @ 09CE10, 09). Rahul Suryodai @ 09CE45, 10). Trina Kamalika Chowdhury @ 09CE52, 11). Md. Tarik Rafsan Majaharie @ 10CE19, 12). Indranath Biswas @ 10CE28, 13). Vivekananda @ 10CE40, 14). Kundan Kumar @ 10CE49, 15). Miaaza Hussain @ 10CE61, 16). Abu Jafor Middya @ 11CE19, 17). Himanshu Jha @ 11CE20, 18). Amit Singh Negi @ 11CE40, 19). Uddipto Ghosh @ 12CE09),  20). Arsad Neyaz @ 12CE12, 21). Kaunteyesh Singh @ 12CE22, 22). Jhungeer Bibi Ameera @ 12CE65, 23). Ravi Kumar Jangid @ 13CE31, 24). Soumyadeep Mondal @ 13CE46, 25). Pemmasani Sambasivarao @ 13CE59, 26). Leckhraj Luchoomun @ 13CE62, 26). N.Manesha Manoon mani @ 14CE56, 28). Tshewang Peldon @ 14CE64, 29). Karma Tashi Jamtsho @ 14CE67, 30). Gaurav Kumar @ 14CE68, 31). Swarnika Chandra @ 13CE18, 32). Narendranath Das @ 15CE02, 33). Riya Mondal @ 15CE07, 34). Somu Sandeep Reddy @ 15CE51, 35). Ankan Ata @ 15CE55), 36). Poulome Roy @ 16CE8008, 37). J Ramakrishna @ 16CE8009, 38). Vivek Raj @ 16CE8014, 39). Moluguri Harsha Vardhan @ 17CE8040, 40). Ajit Gupta @ 17CE8041, 41). Bendi Venkatesh @ 17CE8042, 42). Aneek Biswas @ 17CE8058, 43). Bindas R Jorwal @ 18CE8021, 44). Kalluri Rajashekar Reddy @ 18CE8031, 45). D Sai Kowshik @ 18CE8035, 46). Jayachandra Naragana @ 18CE8037, 47). Satyam Shorya Jha @ 19CE8002, 48). Srijan Saha @ 19CE8025, 49). Koena Saha @ 19CE8044, 50). Aritro Ghosh @ 20CE8035, 51). Gourish Maitra @ 20CE8062, 52). Prathi Sai Durga Bhavani @ 20CE8073, 53). Sudheer Kumar Guri @ 20CE8078, 54). Ankita Ghosh @ 21CE8020, 55). Nirbheek Ghosh @ 21CE8024, 56). Yash Paswan @ 21CE8058, 57). L. Sanjana @ CE218080   

                            

 


Academic Identity