Sl No | Title | Name of the PI | Name of the CoPIs | Funding Agency | Amount (Rs.) | Project Status | Date of Initiation | Date of Completion |
---|---|---|---|---|---|---|---|---|
1 | Developing suitable pedagogical methods for various classes, intellectual calibers and e-learning. Course name “Design of RC Structure”. | Pronab Roy | Prof. K. Bhattacharya | National Mission Project on Education through ICT, Under MHRD, Government of India | Completed | 2014-01-02 | 2016-07-30 | |
2 | A Novel Approach for Vegetation Based Clogging Removal of Pervious Paver Block Containing waste Reclaimed Materials | Suman Saha | Sabyasachi Biswas | WB STBT | 1600000 | Ongoing | 2025-01-01 | 2028-03-01 |
3 | RIG -(SEED Money-NIT Rkl) | Dr. Sanku Konai | Nil | NIT Rourkela | 200000 | Completed | ||
4 | Sustainable Ground Improvement through Granular Column...... | Dr. Sanku Konai | Dr. S. Dutta | WBDST | 1630000 | Ongoing | ||
5 | A Novel Approach for Vegetation Based Clogging Removal of Pervious Paver Block Containing Waste Reclaimed Materials | Dr. Suman Saha | Dr. Sabyasachi Biswas | DSTBT, GoWB | 1600000 | Ongoing | 2024-12-06 | |
6 | Development of eco-friendly Heat Reflective Bricks and manufacturing of eco-friendly shuttering material from various Agro-wastes | DDas | SPal AKSamanta | NBCC R&D | 1 | Ongoing | ||
7 | Water leakage detection in water distribution systems and evaluating the state of urban water bodies: Remote Sensing Based Approach | Dr. Gilbert Hinge | None | DST-SERB | 3023900 | Ongoing | 2024-01-10 | |
8 | Improving the performance of satellite precipitation products across different climatological and topographical zones of India | Dr. Gilbert Hinge | None | DST-SERB | 1324000 | Ongoing | 2023-10-12 | |
9 | Potential use of fine-grained clay soil as landfill liner for containment of pollutants in waste disposal site | Dr. Supriya Pal, Associate Professor, Department of Civil Engineering, National Institute of Technol | Dr. Kalyan Adhikari, Professor, Dept. of Earth and Environmental Studies, NIT Durgapur | RIG, MHRD, GoI | 2000000 | Completed | 2016-02-22 | 2018-10-25 |
10 | Grossly Polluting Industries (GPIs) inspection by National Institute of Technology Durgapur in Main stem States of River Ganga | Dr. Supriya Pal | Dr. Sandip Mondal | Central Pollution Control Board, GoI | 663750 | Completed | 2021-12-10 | 2022-03-31 |
Sl No | Title | Name of the PI | Consultant | Funding Agency | Amount (Rs.) | Project Status | Date of Initiation | Date of Completion |
---|---|---|---|---|---|---|---|---|
1 | Slope Stability Analysis | Dr. Sanku Konai | 2 | MES | 150000 | Completed | 2024-02-19 | 2024-07-25 |
2 | Safely & stability Test for structural soundness of existing Fire affected ESI Hospital at Sealdah West Bengal | AKSamanta | P Roy | ESIC RO Kolkata | 1 | Completed | 2024-09-21 | |
3 | TPQA Service for Construction of G+5 Structural Lab, Classroom Complex at IIEST. | AKSamanta | S Pal, D Das | CPWD | 1 | Ongoing | 2025-01-30 | |
4 | Proof checking /approval of design & drg for two RCC tunnels@Shyamsundarpur, ECL | D Das | S Pal, AKSamanta | Vensar Constrn., Hyderabad | 1 | Ongoing | 2025-01-02 | |
5 | Concrete Mix designs for AIPL, Zetwerk Asansol Railway Developement Project | AKSamanta | S. Saha | Auri Infra Ltd. | 1 | Ongoing | 2025-03-20 | |
6 | 162). Proof checking of proposed various structures at Sohiong, Niwatram, Rompara and Willian Nagar under Meghalaya state | Dr. Somnath Karmakar | NIL | GOI | Ongoing | 2025-04-16 | ||
7 | 161). Proof checking of the Construction of L G S F Framed Office for Entry/ Exit with Boom Barriersat CCL Sites in Jharkhand | Dr. Somnath Karmakar | NIL | GOI | Completed | 2025-02-06 | 2025-03-11 | |
8 | 160). Proof checking for the Adequacy Test where a new bridge is being constructed adjacent to an existing bridge (9 nos) without site visits under Danapur division of SER | Dr. Somnath Karmakar | NIL | Rail | Ongoing | 2025-02-21 | ||
9 | 159). Proof checking of the design and drawing for the three sites of the Tourist Development Infrastructure, Meghalaya | Dr. Somnath Karmakar | NIL | GOI | Completed | 2025-02-07 | 2025-02-28 | |
10 | 158). Third party vetting in connection with construction of RC bridge over river Nunia with approach road at Ratibati under Raniganj block in the district of Paschim Bardhaman | Dr. Somnath Karmakar | Plus Two | PMGSY @ GoI | Completed | 2023-07-15 | 2024-05-28 |