| Sl No | Title | Name of the PI | Name of the CoPIs | Funding Agency | Amount (Rs.) | Project Status | Date of Initiation | Date of Completion |
|---|---|---|---|---|---|---|---|---|
| 1 | Pre-feasibility study of Battery Electric buses in India | Bandhan Bandhu Majumdar (Indian Lead) | Prasanta Kumar Sahu Prof. Ashoke Sarkar Dimitris Potoglou, Cardiff University UK Georgina Santos, Cardiff University UK | GCRF UK | 1300000 | Completed | ||
| 2 | Congestion Pricing: Planning for optimal strategies and commuters behavioral implications under different pricing schemes | Prasanta Kumar Sahu | Bandhan bandhu Majumdar Dimitris Potoglou, Cardiff University Georgina Santos, Cardiff University Dilum D, Newcastle University | MHRD SPARC | 2900000 | Ongoing | ||
| 3 | Development of a comprehensive methodology to improve road traffic safety in Indian urban roadways based on advanced statistical techniques | Bandhan Bandhu Majumdar | NA | DST SERB Start Up Research Grant | 1139000 | Completed | ||
| 4 | Development of Pedestrian Facility Assessment Tool for Improving Pedestrian’s safety condition in Hyderabad | Bandhan Bandhu Majumdar | Prasanta Kumar Sahu | AIA Hyderabad | 100000 | Completed | ||
| 5 | An investigation on factors influencing bicycling and walking in urban Indian context: A case study of Hyderabad, India | Bandhan Bandhu Majumdar | NA | BITS Pilani Hyderabad Campus (Research Initiation Grant) | 200000 | Completed | ||
| 6 | Structural Health Monitoring | Aloke Kumar Datta | RIG (NIT-DGP) | 2000000 | Completed | 2014-2017 | ||
| 7 | Design and development of crack detection system in steel bridges using acoustic emission technique : Order No. DST/TSG/STS/2015/62(C | Pijush Topdar | Aloke Kumar Datta | DST,TDP | 8864000 | Completed | 24.07.2017 | |
| 8 | Need Assessment Survey & Design Clinic workshop for refractory cluster at Asansol | Amiya Kumar Samanta | AK Saha | NID Ahmedabad | Completed | May-2012 | ||
| 9 | Simulation of wind induced deformation and bending effects on shell wall of ground elevated cylindrical stacklike structures. | Amiya Kumar Samanta | NIL | RIG, NITD | Completed | Aug-2014 | ||
| 10 | Management of seawater intrusion in coastal aquifers | Amlan Das | MHRD | 300000 | Completed | 2000 | 2003 |
| Sl No | Title | Name of the PI | Consultant | Funding Agency | Amount (Rs.) | Project Status | Date of Initiation | Date of Completion |
|---|---|---|---|---|---|---|---|---|
| 1 | 169). Proof checking of the structural audit of the MES building at Barrackpore, including site visits | Dr. Somnath Karmakar | NIL | MES | Completed | 2025-12-02 | 2025-12-20 | |
| 2 | 170). Proof checking of minor and major bridges substructure without site visit under ECR | Dr. Somnath Karmakar | NIL | Rail | Ongoing | 2026-01-28 | ||
| 3 | 168). Proof checking for 60.5 m steel through bridge girder for the erection and launching scheme without site visits | Dr. Somnath Karmakar | NIL | Rail | Completed | 2025-09-24 | 2025-12-08 | |
| 4 | 167). Proof checking of 13 nos bridge substructure under EC Railways | Dr. Somnath Karmakar | NIL | Rail | Completed | 2025-10-08 | 2025-12-06 | |
| 5 | Vetting of G+3 Postal CPMG Bldg at Sech Bhawan, Post Office at Block-DE, Salt Lake. | AKSamanta | S Pal | PCD-I Kolkata | 1 | Completed | ||
| 6 | RCA of cracks for TIGPS at Bolpur | AKSamanta | S Pal | TIGPS Bolpur | 1 | Completed | ||
| 7 | Building Safety & Stability Check for TIGPS at Midnapore | AKSamanta | . | TIGPS | 1 | Completed | ||
| 8 | 166). Proof checking of G+2 storied RC building for provision of lean to the Hangar arms in both the Hangers at coast guard air station Chennai without site visit | Dr. Somnath Karmakar | NIL | GoI | Completed | 2025-07-07 | 2025-09-10 | |
| 9 | 165). Expert opinion in the Civil Engineering consultancy job of strengthening work of SH-9 Ch. 3.8 KM to 36.30KM under PWD of Bishnupur division with site visits | Dr. Somnath Karmakar | NIL | GoWB | Completed | 2025-08-07 | 2025-08-21 | |
| 10 | 164). Proof checking for 48 m welded bowstring girder (ROB No 80) of the erection and launching scheme | Dr. Somnath Karmakar | NIL | Rail | Completed | 2025-07-01 | 2025-07-22 |