| Sl No | Title | Name of the PI | Name of the CoPIs | Funding Agency | Amount (Rs.) | Project Status | Date of Initiation | Date of Completion |
|---|---|---|---|---|---|---|---|---|
| 1 | Nonlinear Coupled Dynamic Analysis of Deep Water Floating Facilities | Atul Krishna Banik | NITD, Grant No. NITD/Regis/OR/25 | 1000000 | Ongoing | 2014-2015 | ||
| 2 | Prospects and study of floating offshore wind turbine (FOWT) platforms for wind energy harnessing | Atul Krishna Banik | Department of Science & Technology, Higher Education, Govt. of WB, Grant No. 254(Sanc.)/ST/P/S&T/4G-07/2017 | 850000 | Ongoing | 2017-2018 | ||
| 3 | Structural Health Monitoring | Dr. Pijush Topdar | Dr. A.K. Datta | NIT Durgapur (through Research Initiation Grant) | 2000000 | Completed | 2017-07-24 | |
| 4 | Design and Development of Crack Detection System in Steel Bridges using Acoustic Emission Technique. | Dr. Pijush Topdar | Dr. A.K. Datta | DST-TSDP, Govt. of India | 5945000 | Completed | ||
| 5 | Reliability-Based Mix Design of Pumpable Concrete. | Pronab Roy | NIT Durgapur | Completed | 2014 | 2018 | ||
| 6 | Seismic protection of masonry buildings by geosynthetic | Dr. R.P.Nanda | No | RIG_NIT Dgp | 720000 | Completed | ||
| 7 | Design of Steel and Concrete Structures | Showmen Saha | Consultancy of Third Party Quality Control of CPWD Projects. | |||||
| 8 | Effect of Explosive Reactive Armour on Bridges under blast loading | Dr. Somnath Karmakar | NIL | NIT Durgapur | 500000 | Completed | 2019-04-04 | 2021-04-03 |
| 9 | Assessment of Groundwater Potential In and Around the Industrial Belt of Durgapur, West Bengal | Soumya Bhattacharyya | Dr. Aniruddha Gangopadhyay | M.H.R.D., Govt of India | 500000 | Completed | 2000-03-30 | 2002-08-27 |
| 10 | LAND SUBSIDENCE STUDY OF CBM GAS PRODUCING BLOCK. | Dr. Kalyan Adhikari, Dept. of EES | Dr. Supriya Pal, Dept. of CE | Essar Oil Ltd. (E&P Division), WEBEL IT PARK, DURGAPUR-713208, WEST BENGAL, INDIA | 800000 | Completed | 17.12.2015 |
| Sl No | Title | Name of the PI | Consultant | Funding Agency | Amount (Rs.) | Project Status | Date of Initiation | Date of Completion |
|---|---|---|---|---|---|---|---|---|
| 1 | Vetting of G+3 Postal CPMG Bldg at Sech Bhawan, Post Office at Block-DE, Salt Lake. | AKSamanta | S Pal | PCD-I Kolkata | 1 | Completed | ||
| 2 | Building Safety & Stability Check for TIGPS at Midnapore | AKSamanta | . | TIGPS | 1 | Completed | ||
| 3 | RCA of cracks for TIGPS at Bolpur | AKSamanta | S Pal | TIGPS Bolpur | 1 | Completed | ||
| 4 | 166). Proof checking of G+2 storied RC building for provision of lean to the Hangar arms in both the Hangers at coast guard air station Chennai without site visit | Dr. Somnath Karmakar | NIL | GoI | Completed | 2025-07-07 | 2025-09-10 | |
| 5 | 165). Expert opinion in the Civil Engineering consultancy job of strengthening work of SH-9 Ch. 3.8 KM to 36.30KM under PWD of Bishnupur division with site visits | Dr. Somnath Karmakar | NIL | GoWB | Completed | 2025-08-07 | 2025-08-21 | |
| 6 | 164). Proof checking for 48 m welded bowstring girder (ROB No 80) of the erection and launching scheme | Dr. Somnath Karmakar | NIL | Rail | Completed | 2025-07-01 | 2025-07-22 | |
| 7 | Building Safety & Stability Check for TIGPS at Rangamati, Midnapore | AKSamanta | Nil | TIGPS | 1 | Completed | ||
| 8 | Concrete Mix design for Asansol railway Redevelopement Project | AKSamanta | S Saha | Zetwerk /AIPL | 1 | Ongoing | ||
| 9 | Proof Checking /Vetting of Structural Design & Drg. for proposed horizontal extension of existing Club for enhancing capacity at CLW, Chittaranjan | S Saha | AKSamanta | Pvt. | 1 | Completed | ||
| 10 | Concrete Mix Design | VKD | Dr. S. Konai+3 | Rahee Infratech Limited | 637000 | Completed |