Latest News
Civil Engineering

Projects

Sponsored Projects

Sl No Title Name of the PI Name of the CoPIs Funding Agency Amount (Rs.) Project Status Date of Initiation Date of Completion
1Nonlinear Coupled Dynamic Analysis of Deep Water Floating FacilitiesAtul Krishna BanikNITD, Grant No. NITD/Regis/OR/251000000Ongoing2014-2015
2Prospects and study of floating offshore wind turbine (FOWT) platforms for wind energy harnessingAtul Krishna BanikDepartment of Science & Technology, Higher Education, Govt. of WB, Grant No. 254(Sanc.)/ST/P/S&T/4G-07/2017850000Ongoing2017-2018
3Structural Health MonitoringDr. Pijush TopdarDr. A.K. DattaNIT Durgapur (through Research Initiation Grant)2000000Completed2017-07-24
4Design and Development of Crack Detection System in Steel Bridges using Acoustic Emission Technique.Dr. Pijush TopdarDr. A.K. DattaDST-TSDP, Govt. of India5945000Completed
5Reliability-Based Mix Design of Pumpable Concrete.Pronab RoyNIT DurgapurCompleted20142018
6Seismic protection of masonry buildings by geosyntheticDr. R.P.NandaNoRIG_NIT Dgp720000Completed
7Design of Steel and Concrete StructuresShowmen SahaConsultancy of Third Party Quality Control of CPWD Projects.
8Effect of Explosive Reactive Armour on Bridges under blast loadingDr. Somnath KarmakarNILNIT Durgapur500000Completed2019-04-042021-04-03
9Assessment of Groundwater Potential In and Around the Industrial Belt of Durgapur, West BengalSoumya BhattacharyyaDr. Aniruddha GangopadhyayM.H.R.D., Govt of India500000Completed2000-03-302002-08-27
10LAND SUBSIDENCE STUDY OF CBM GAS PRODUCING BLOCK.Dr. Kalyan Adhikari, Dept. of EESDr. Supriya Pal, Dept. of CEEssar Oil Ltd. (E&P Division), WEBEL IT PARK, DURGAPUR-713208, WEST BENGAL, INDIA800000Completed17.12.2015

Consultancy Projects

Sl No Title Name of the PI Consultant Funding Agency Amount (Rs.) Project Status Date of Initiation Date of Completion
1Vetting of G+3 Postal CPMG Bldg at Sech Bhawan, Post Office at Block-DE, Salt Lake.AKSamantaS PalPCD-I Kolkata1Completed
2Building Safety & Stability Check for TIGPS at MidnaporeAKSamanta.TIGPS1Completed
3RCA of cracks for TIGPS at BolpurAKSamantaS PalTIGPS Bolpur1Completed
4166). Proof checking of G+2 storied RC building for provision of lean to the Hangar arms in both the Hangers at coast guard air station Chennai without site visitDr. Somnath KarmakarNILGoICompleted2025-07-072025-09-10
5165). Expert opinion in the Civil Engineering consultancy job of strengthening work of SH-9 Ch. 3.8 KM to 36.30KM under PWD of Bishnupur division with site visitsDr. Somnath KarmakarNILGoWBCompleted2025-08-072025-08-21
6164). Proof checking for 48 m welded bowstring girder (ROB No 80) of the erection and launching schemeDr. Somnath KarmakarNILRailCompleted2025-07-012025-07-22
7Building Safety & Stability Check for TIGPS at Rangamati, MidnaporeAKSamantaNilTIGPS1Completed
8Concrete Mix design for Asansol railway Redevelopement ProjectAKSamantaS SahaZetwerk /AIPL1Ongoing
9Proof Checking /Vetting of Structural Design & Drg. for proposed horizontal extension of existing Club for enhancing capacity at CLW, ChittaranjanS SahaAKSamantaPvt.1Completed
10Concrete Mix DesignVKDDr. S. Konai+3Rahee Infratech Limited637000Completed